خلاصہ

To succeed in an environment of growth and excellence and earn a job which provides me job satisfaction and self development and help me achieve personal as well as organizational goals.

تجربہ

کمپنی کا لوگو
Sr. Officer Chemical
Hub Power Plant - HPSL
مارچ ۲۰۱۷ - موجودہ | Hub Chowki, Pakistan

 Maintain the boiler water/steam chemistry, and ensure appropriate chemical protection during continuous operation and shutdown.

 Interpretation of OCM and internal/external lab analysis results of lube oil, FRF, transformer oil and RFO for any corrective/preventive actions.

 Conduct boiler, MED & GAH inspections, perform environmental monitoring of stack flue gas & waste water, and compile technical reports.

 Interpretation of boiler parameters to ensure efficient chemical treatment.

 Conduct and participate in the PHA/HAZOP meetings, risk assessment, and ensure the implementation of recommended actions.

 Conduct routine audit of work areas and ensure the execution of tasks in accordance with established PSM and site procedures.

 Lead the team to resolve chemistry lab equipment issues with vendor, develop SOP’s and conduct acceptance test of new procure equipment.

 Evaluate techno-commercial feasibility of new projects, and present the best proposal to higher management, for their consideration.

کمپنی کا لوگو
Project Team Leader
EnviroChem International
جنوری ۲۰۱۵ - فروری ۲۰۱۷ | Karachi, Pakistan

 Assist project director in techno-commercial meetings with higher management of Power & Oil sector of Pakistan.
 Coordinate with client to ensure competent service, and all project deliverables are achieved, and manage project procurement.
 Communicate with principal abroad for any specific requirement of client and execute accordingly.
 Determines project specifications by studying product design, P&ID, customer requirements, and performance standards; completing technical studies & preparing cost estimates.
 Ensure that all project engineering work is carried out in accordance with site rules, regulations and SOP’s with due regards to safety and operability.

کمپنی کا لوگو
Project Engineer
EnviroChem International
جولائی ۲۰۱۴ - دسمبر ۲۰۱۴ | Karachi, Pakistan

 Worked as a Project Engineer at thermal power station HUBCO and JAMSHORO.
 Assist foreign expert in boiler and GAH inspections and justify modification.
 Review and evaluate technical documents and proposed modifications to improve efficiency, quality and performance of the Unit.
 Evaluate critical boiler parameters to ensure efficient fuel oil treatment and present monthly and quarterly reports.
 Monitor environmental aspects of flue gas emissions and ADT.
 Supervise lab testing, analyze fuel chemistry, behavior of boiler soot & corrosion rate.

کمپنی کا لوگو
Internee
Lucky Cement Limited
نومبر ۲۰۱۳ - دسمبر ۲۰۱۳ | Karachi, Pakistan

کمپنی کا لوگو
Internee
Novatex Polymer Ltd
جون ۲۰۱۲ - جولائی ۲۰۱۲ | Karachi, Pakistan

تعلیم

NED University of Engineering & Technology
ماسٹرز, ماسٹرز ان سائنس, Masters in Engineering Management‎
Accounting and Financial Management, Project Management, Health, Safety and Environmental Engineering
CGPA 3.1/4
2016
Dawood University of Engineering & Technology (DUET)
بیچلرز, , B.E chemical engineering‎
Chemical Science
فی صد 78%
2014

زبانیں

ابتدائی چینی
ماہر انگریزی
متوسط اردو

آپ کن کمپنیز کی پیروی کر رہے ہیں

Muhammad آپکے جاننے والے