خلاصہ

Dear Sir!
I recently applied for your position, and I just wanted to reiterate my strong interest. I think it might be a great match, and I’d love to talk with you about it when you’re ready to begin scheduling interview

پراجیکٹس

sewage system

تجربہ

کمپنی کا لوگو
Residential Civil Engineer
Shikarpura textile cross stitch lahore
مارچ ۲۰۱۸ - موجودہ | Lahore, Pakistan

Report to director on daily basis.
Planned Survey Schedule with Estimate of materials, time and labor cost installed.
Maintaining overall quality of construction project.

کمپنی کا لوگو
CIVIL ENGINEER
WORK MAN
نومبر ۲۰۱۷ - اکتوبر ۲۰۱٦ | Lahore, Pakistan

The responsibilities include in my duties are as under:
(a) Coordination with Contractor\'s,Architects,Sub-Contractor\'s etc.
(b) Ensured that the work is done as per standard construction procedure.
(c) Working closely with all level of management, engineer and field operations staff.
(d) Report to director on daily basis.
(e) Planned Survey Schedule with Estimate of materials, time and labor cost installed.
(f) Maintaining overall quality of construction project.

کمپنی کا لوگو
SITE SUPERVISOR
LUXUS GRAND HOTEL
اگست ۲۰۱٦ - جولائی ۲۰۱۴ | Lahore, Pakistan

The responsibilities include in my duties are as under:
(a) Maintaining overall quality of construction project
(b) Ensured that the work is done as per standard construction procedure
(c) Manage task according to time schedule
(d) Assign duties to staff and provide guidance
(e) Report to director on daily basis
(f) Control the cost of project and meet the budget criteria
(g)) Auto Cad working

کمپنی کا لوگو
SITE SUPERVISOR
ALI\' BROTHER COMPANY
جولائی ۲۰۱۴ - جون ۲۰۱۳ | Lahore, Pakistan

The responsibilities include in my duties are as under:
(a) Maintaining overall quality of construction project
(b) Ensured that the work is done as per standard construction procedure
(c) Manage task according to time schedule
(d) Assign duties to staff and provide guidance
(e) Report to director on daily basis
(f) Control the cost of project and meet the budget criteria
(g)) Auto Cad working

تعلیم

The University of lahore
بیچلرز, بیچلرز ان ٹیکنالوجی, CIVIL TECHNOLOGY‎
CONSTRATION, SURVERY
CGPA 2.9/4
2017
Lahore Poly-Technical Institute
ڈپلوما, 3 year Diploma in Civil Technology‎
Construction Studies
مکمل
2013
Govt Islamia College Railway Pakistan - Lahore
میٹرک / او لیول, سائنس, SCIENCE‎
Chemistry, Physical Chemistry, Applied Mathematics
فی صد 50%
2006

پیشہ ورانہ مہارتیں

متوسط 2D Drwaing
ماہر Cooordination Skills
متوسط Handling Assignments
ابتدائی Instruments Drawing
ابتدائی RESTful APIs

زبانیں

ماہر پشتو
ماہر پنجابی
ماہر انگریزی
ابتدائی اردو