Transmission Engineer at Huawei Pakistan
Project Coordinator at Turnotech
BSS & Transmission Engineer at SPINE ENGINEERING
MOBILINK/WARID merger 2016/17 (Ericsion To Huawei Swap)(Center)
Worked as POC & site engineer for BSS & MW
Icc500 installation and commissioning
RTN 320 installation and commissioning
MOBILINK GRFU/DRFU to RRU swap
Ericson equipment dismantlement
Alarms configuration and troubleshooting
Site survey by using ISDP
CMPAK 3g/4g roll out (center)
Worked as POC & site engineer
3g/4g installation & commissioning
2g cutover from HUAWEI GRFU/DRFU to RRU
3g/4g commissioning
Site installation quality according to QC Report according to smart QC
Site handover to customer (ATP)
Ufone 1200 & MBB SWAP 2016/17(North & Center)
Worked as POC & site engineer
Swap, BTS3900 to BDS3900 & troubleshooting
PAT activity using WDT and ISDP tools for UFONE 1200 swap project
MOBILINK OSN Connectivity
OSN connectivity at MGW and fiber Nodes for Mobilink
CMPAK MW 2015/16 (North)
Media cutover for CMPAK from Alcatel to HUAWEI
Microwave Link RTN 980, 950, 910, 905 (HUAWEI), Installation & Commissioning
Installation, configuration, alignment and commissioning of 1+0,1+1,1+1 XPIC and SD links
Snag identification, rectification
Pre PAT & PAT(Provisional acceptance test
CMPAK 2015/16 project MW/LOS survey
MOBILINK Site Relocation Project 2014/15
Preparation of LEQ's, equipment verification according to delivery note (DN's)
Equipment scanning and preparation of scan sheet
Raise RR’s & STR’s for MOBILINK site relocation project 2015
CMPAK MW Dismantlement 2014/15/16 (north)
Alcatel mw equipment dismantlement
CMPAK mw survey 2014/15(north)
Los site survey and report preparation
CMPAK Filter Testing 2014/15 (North)
Worked as a BSS Engineer at ARKLAYS TECHNOLOGIES (PVT) LTD (8 Months)
PTCL LTE Falcon Project (south)