Obtain the position of organization as an industrial engineer where I can upgrade my knowledge, skills and acquire competence in applying engineering principles to practical problems.
KEY RESPONSIBILITIES:
Making Operation Breakdown Of Styles (Denim +Western +Knit+ Men’s,
Boys Shirt + Ethnic Kids)
Making Constraint Report Style Wise Before Production Started In
Production For Advance Style Operations Understating To Minimize Issues
& Time On Daily Basis
Pre costing Of Woven Department (Western+ Men’s, Boys Shirt) + Denim
+ Knitwear & Thread Consumption before the Induction of Style
Line Balancing
Workstation Layouts
Coordination with Merchandising Department
Motion & Time Study
Implementation of 5s to Woven Section
Cost Reduction
Calculating Efficiency of Woven & Ethnic Kids Section On Daily Basis &
Finalize I.E Rates For Stitching Operations Based On Skill Level
Making Data Bank Of SMV’s Of Stitching & Finishing Operations
Implement Process Improvement Methods In production &Finishing To
Increase Production Level
Reducing & Calculating Non Productive Time on Floor
Allocation & Assure The Availability Of Machines(Resources)
KEY RESPONSIBILITIES:
Making Production Induction Plan
Track & Article wise planning of Master plan.
Execution of plan in production
Making specification files of product against order
Estimating the Standard Minutes (SAM) for targets and efficiency Evaluation
Calculating daily floor Efficiencies, Capacities, Constraints and on and
off standard times.
Monthly Production Schedule (MPS) along with Production Plan &
Shipment Dates Commitments.
Responsible for making Material requirement plan (daily, monthly, and
quarterly) through production forecast.
Monitoring and reviewing daily output and discuss with concern HOD in
case of deviations from set targets.
Discuss every order with Processing ,Stitching & Marketing department if
committed dates are deviated
Conduct daily, weekly and monthly meetings with Production, Marketing,
Procurement and Ware-house/Shipping departments in order to maintain
smooth flow of supply chain and to secure timely shipment
In Aug 2016, I started rendering my service as Assistant Engineer IE in
Industrial Engineering Department at Sadaqat Textile Mills Faisalabad.
Successfully Implemented & maintained SAM in Stitching, Cutting
&Packing
Time & Motion study of new product to calculate SMV and make
Operation Breakdown Bulletin.
Working on Strength & Standardize MMR From "Cut to Pack"
To control Loss Minutes calculate daily Machine Utilization & Efficiency.
Assign Production targets to operators, Folders, Turners, and Calculate
Their efficiencies
To study & discuss Automated cutting M/C (Hauser Parker) related
Issues with top management and take corrective action to fix issues
Layout making of every new department through using IE techniques &
Proper implementation of Process flow through technical skills
Ensure Layout is Completed & Implemented according to plan & in given
Time Frame.
Provide & Maintain safe & clean environment by enforcing procedures
Rule & regulation
Maintain product & company reputation by complying Rules.
Implementing Lean Manufacturing concept to reduce & improve
productivity through 5S, Kanban, Kaizen & SMED Analysis etc.
Enhancement of productivity through proper utilization of Available
Resources
Successfully implement methods through proper Time study & Motion
Study.
Productivity improvement through Time & Motion Study