My name is Iftikhar Ahmed.I have done Electrical Engineering from Mehran University of Engineering Technology Jamshoro in 2012. I joined Albario Engineering (Pvt) ltd (AEPL) 747 MW Guddu Power Plant (CCPP), Currently working in Orient Energy System (OES).
1.1 M/s Getz Pharma Project:
In Getz Pharma 132kV underground Transmission line Project working as Senior Engineer from Korangi Gas Turbine Power Station (KGTPS) to Getz Pharma New Plant on following tasks,
• Design & Inspection of Material.
• Supervision of Erection and Installation for Underground Transmission line.
• Witnessing of Testing for 132kV Underground Transmission Lines.
1.2 M/s K-Electric Earthing/Grounding Project:
• Project Engineer at Earthing /Grounding Project of K-electric grids. There are twenty-nine (29) grids located in different areas are operating under the K-Electric.
1.3 M/s K-Electric TP-1000 Project:
• Preparation of the Proposal.
• Design & Execution
• Surveys for Transmission Line routes and to identify the utilities for ROW.
1.4 M/s K-Electric Lyari-Mauripur Project 132kV Underground Project:
• Design & Inspection of Material.
• Witnessing of Testing for 132kV Underground Transmission Lines.
• Supervision of Erection and Installation for Underground Transmission Line.
1.5 M/s Aga Khan University Hospital 132kV Grid station:
• Carried out Operation & Maintenance activities on MV switchgear including Preventive Maintenance, Testing, and Installation of Siemens Switches.
• The managed entire scope of Installation, Operation, and Maintenance of 132KV switchgear including Circuit Breakers, Isolators, and Lightning Arrestors.
• Performed Centrifuging of Transformer Oil.
• Performed Periodic testing such as Dielectric, C&DF, T.T.R, Megger, Contact Resistance and Vacuum Testing.
• Power Transformer Maintenance: Oil treatment, Bleeding, Differential, PRD, Diverter, Buchholz, Thermal Protection, Cooling fan grouping, Auxiliaries faults, and wiring.
• Power Transformer Pre-commissioning Tests: IR, TTR (OLTC), Differential, Vacuum, Bleeding, Megger, Buchholz etc.
• Battery Bank and Charger Work: Commissioning, Pre-commissioning Test, and Maintenance.
Worked as an Electrical Engineer in Albario Engineering (Pvt) Limited 747MW CCPP Guddu.
( June 2013 to September 2014)
• Gas Turbine Hall Supervision.
• Witnessing of different tests like IR, PI & DC HIPOT.
• Site Safety.