خلاصہ

My work experience is about 7 years in civil works.

تجربہ

کمپنی کا لوگو
Senior Engineer
Usman Ibrahim Contractors
اگست ۲۰۲۲ - موجودہ | Karachi, Pakistan

Enter Description

کمپنی کا لوگو
Assistant Manager Civil
Pakistan Security Printing Corporation
جون ۲۰۲۰ - جولائی ۲۰۲۲ | Karachi, Pakistan

Report writing, preparation of BOQS, repair and maintenance work

کمپنی کا لوگو
Field Engineer
SAFWCO
جولائی ۲۰۱۹ - نومبر ۲۰۱۹ | Umer Kot, Pakistan

The proposed project aims to contribute & concentrate on increased access to portable drinking water through installation, rehabilitation & restoration of damaged water sources. The project will increase existing water discharge capacity of the communal dug wells through upgrading them with submersible pumps powered by renewable energy. Community local water reservoirs will also be repaired for storage of water aimed at both human & livestock animals. At Institution level, primary schools will be provided with drinking water & sanitation facilities to build students resilience to recurrent draught shocks.

کمپنی کا لوگو
Junior Engineer
Associated Consulting Engineers Pvt. Ltd
مارچ ۲۰۱٦ - فروری ۲۰۱۹ | Kashmir, Pakistan


Project DetailsThe Project utilizes a gross head of 420m by diverting the Neelum River at Nauseri to the lower reach of the Jhelum River at Zimanabad through a 32.5 km long tunnel system. A concrete gravity diversion dam will be 160m long by 60m high with 03 radial gates and a large flap gates at Nauseri on the Neelum River. The intake structure with a capacity of 280 cumecs is located close to the diversion dam and incorporates six intake gates, which are connected to the sedimentation basins. A diversion tunnel with a capacity of 500 cumecs is built to carry dry season flows only around the dam foundation site. A headrace tunnel system of 28.5 km is constructed. An underground power station having 04 units with a total maximum capacity of 969 MW is constructed at Chattar Kalas, Muzaffarabad. 12 single phase transformers units are to be installed each 98.33 MVA at the power station. An approximate 4 km long tailrace tunnel will discharge the collected water in Jhelum River at Zaminabad.My Responsibilities1. Inspection and supervision of following construction works2. Structural concrete works of Main Dam spillway piers, stilling basin, intake & sedimentation basin, collecting canal & protection slabs.3. Inspection of reinforcement for these hydraulic structures, water stop installation etc.4. Installation of grouting system (grout, drain, vent pipes & grooves) at the contraction joints.5. Placing of different types of concrete of strength varies from 12psi to 60psi in lifts of specified height.6. Exposing/ preparation of rock beds foundation.Dewatering & control of water during at concrete works.7. Slop Stabilization by using rock bolt & shotcrete.Placing of roller compacted concrete & its related testing.8. Installation of anchor bolts & drainage holes inside the rock in spillway & stilling basin area.Preparation of daily, weekly & monthly progress reports.9. Supervision of backfill behind sedimentation basin left wall.10.Contact grouting in tunnel.

تعلیم

Phoenix Consultant
سرٹیفیکیشن, IOSH Managing Safely‎
Safety Training
مکمل
2017
Sir Syed University Of Engg. & Technology Karachi.
بیچلرز, بیچلرز ان ٹیکنالوجی, BS Civil Engineering‎
Construction Studies
CGPA 2.65/4
2014

پیشہ ورانہ مہارتیں

متوسط Civil Affairs Handling
ابتدائی Civil Design Knowledge
ابتدائی Civil Drafting
ماہر Civil Engineer
متوسط Civil Procedures
ماہر Civil Supervision
ماہر Computer Skills
متوسط Construction Management
ماہر Construction Site Management
متوسط Cooordination Skills
ماہر Documentation
متوسط Engineering Skills
ابتدائی Fluent in English
ابتدائی Handling Assignments
ماہر Metallurgical Skills
متوسط MS Excel
متوسط Problem Solving Skills
ماہر Receptionist Task Management
متوسط Site Administration
ماہر Site Development
ماہر Special Effects

زبانیں

ماہر اردو
متوسط سندھی
متوسط انگریزی