Have done 4 weeks internship as test engineer for LT & HT panels, Motor Control Panels, DBs etc.
Worked for four weeks at Nishat Textile Mills, Power Plant as Electrical Maintenance Internee. Made a Preventive maintenance plan for the plant equipment. Studied the whole process of Power Plant (CHP plant).
Wrote a research paper on the topic of "Impact of Renewable Energy on Existing Power System" through LUMS (Lahore University of Management and Sciences). Made a software simulation for the effect of Wind Energy on existing power system. Have done the fault analysis, contingency analysis in PSS-E (Power System SImulator for Engineers) Software.
Have done 4 week internship in transformer department (Design).