خلاصہ

To work in tandem with a team in a challenging and competitive environment where I could improve my knowledge, capabilities and put them to use for the development of the organization

پراجیکٹس

Designing of Solar AC for an automobile
Static Stress analysis on Crankshaft of motor bike
Analysis of Torque Vectoring Differential on vehicle Dynamics

تجربہ

کمپنی کا لوگو
Mechanical Engineer
Roshan Packages (Pvt) Ltd
جولائی ۲۰۱۷ - موجودہ | Lahore, Pakistan

– Planning, Performing & Monitoring of Preventive Maintenance & Corrective Maintenance of Extrusion, Printing, Lamination and Slitting Machines

– Preventive & Predictive Maintenance Planning and Manpower arrangements as well as coordination with the operations team
– Responsible for Troubleshooting and immediate rectification of Utility Equipment/Machinery
– Suggest improvements, modifications and up gradation in existing operations
– Follow up and ensure all spare parts availability for smooth running of equipment’s & make Purchase requests
– Maintenance Department 6S control
– Monitoring of Internal departmental targets
– Monitoring and estimation of Utility consumption
– Maintain safety standards while maintenance tasks execution
– Conduct Management Safety Audits
– Conduct safety talk, Near Miss/Unsafe Acts reporting and implementation of WWF\'s Green Office Initiative
– Prepare checklists and monthly maintenance report (MMR)
– Make Job requests for hiring contractual manpower for Plant Civil work
– Provide training to Fresh Graduates and Guests for the understanding of basic plant equipment and job history
– Organize the meeting with Operations Team for the smooth execution of Plant

– Daily monitoring of overall downtimes
– Permit to Work System training and Validation
–Prepare and Present monthly progress of the department in the monthly review meeting

کمپنی کا لوگو
Intern
D.G. Khan Cement Company Limited
اگست ۲۰۱٦ - ستمبر ۲۰۱٦ | Khair Pur, Pakistan

1) Areas of Rotation: crusher area, cement storage area, raw mill area, kiln area, coal mill area, cement storage and Dispatch
- Completely observed the manufacturing of cement
- Observed the working of 1st \'KALINA CYCLE\' in Pakistan
2) Internship report was submitted at the conclusion of the Internship

کمپنی کا لوگو
Summer Intern
Haier Pakistan (Pvt) Ltd.
جولائی ۲۰۱٦ - اگست ۲۰۱٦ | Lahore, Pakistan

Areas of rotation: Refrigeration fatory || Air conditioning factory
- observed different operations in factories
- observed the working of blow moulding machine
- observed the working of Injection molding machine
Internship report prepared at the conclusion of the internship

کمپنی کا لوگو
Summer Intern
Millat Tractors Limited
جون ۲۰۱۵ - جولائی ۲۰۱۵ | Sheikhupura, Pakistan

1) Areas of Rotation: Engine assembly, production section, tractor assembly, material testing and gauge control
- Observed the assembly of engines
- Visited Manufacturnig Section
- Was briefed about various testing and gauge controlling system
2) Recommendations and an internship report were sent to supervisor at the conclusion of the internhship

تعلیم

University of Engineering & Technology
بیچلرز, بیچلرز ان سائنس, Mechanical Engineering‎
Mechanical Design, Aerothermodynamics, Modeling and Simulation in Materials
CGPA 3.3/4
2017
Punjab college of science
انٹرمیڈیٹ / اے لیول, فیکلٹی آف سائنس (پری انجینئرنگ), Intermediate‎
Physics, Mathematics, Chemistry
فی صد 87%
2013
L.D.A model high school lahore
میٹرک / او لیول, سائنس, Matriculation‎
Mathematics, Experimental and Theoretical Solid State Physics, Chemistry
فی صد 91%
2011

پیشہ ورانہ مہارتیں

ابتدائی Ansys
ابتدائی Delievry Planning
ابتدائی HAP
ابتدائی Instruments Drawing
ابتدائی SolidEdge

زبانیں

متوسط پنجابی
ماہر اردو
ماہر انگریزی