خلاصہ

B.Sc. Electrical Engineering in 2012.
M.S in Project Management in 2017.

12 years of professional experience in Hydro and Solar Power Plants.

Currently, working as a Country Head - Techno Commercial to lead design department, operations department and procurement department.

پراجیکٹس

Swabi Textile Mill 5MWp
1.25MWp
FFC 2MWp Solar On Grid Project
4MW Shabir Tiles Karachi
Hydro power plants

تجربہ

کمپنی کا لوگو
Country Head - Techno Commercial
Hadron Solar (Pvt.)Ltd
جون ۲۰۲۳ - موجودہ | Islamabad, Pakistan

Responsible for overall Project Management, PPA Agreements, Cost Management, Time Management, Reporting and Meetings with Stakeholders.
Projects: (PPA and C&I Solar Projects)
C & I Solar Projects: 100kWp to 10 MWp.
PPA Solar Projects: 300kWp to 10 MWp.

کمپنی کا لوگو
Head of Projects and Operations
Zonergy Corporations
اگست ۲۰۲۱ - جون ۲۰۲۳ | Islamabad, Pakistan

Responsible for overall Project Management, execution, designing, procurement, cost Management, Time Management, Reporting and Meetings with Clients and Vendors.
Projects: (EPC and Tender & Bidding Solar Projects).
1). 4.0 MWp Solar Power Plant at Shabir Tiles. Plant Capacity: 4.0 MWp - On grid Hybrid system.
2). 1.25 MWp Solar Power Plant at GIKI University Swabi. Plant Capacity: 1.25 MWp - ON Grid Hybrid system.
3). 2 MWp FFC Rahim Yaar Khan. Plant Capacity: 2.0 MWp - ON Grid System.
4). 100 MI Residential Houses. Plant Capacity: 540 kWp - ON Grid System.
5). 200kWp Air University Islamabad. Plant Capacity: 200 kWp - ON Grid Systems

کمپنی کا لوگو
Manager (Design and Operations)
Barg Engineering Consultants
مارچ ۲۰۱۸ - جولائی ۲۰۲۱ | Peshawar, Pakistan

Responsible for overall Project Management, Operations, designing, Reporting and Meetings with Clients and Vendors.
Projects: (Pakistan Government Solar Projects)
1). Solar Mini Grids in Merged Areas of KPK Pakistan Plant Capacity: 2.60 MWp Off-Grid Hybrid system.
2). 6 District Head Quarter Hospitals in Merged Areas of KPK Pakistan Plant Capacity: 500 kWp off Grid Hybrid system.
3). 10 Basic Health Units and RHCs in KPK Pakistan Plant Capacity: 600 kWp off Grid Hybrid system (50kWp each).
4). Solar Pumping System of (2 HP to 50 HP) in KPK Pakistan. Plant Capacity: (2 HP to 50 HP).
5). Active Solar Tracking Systems (1P and 2P) in KPK Pakistan. Plant Capacity: (40KW to 300KW).

کمپنی کا لوگو
Electrical Field Engineer
Sarhad Rural Support Programme (SRSP)
اگست ۲۰۱۴ - مارچ ۲۰۱۸ | Swat, Pakistan

• Survey, Site Identification & Data Collection.
• Feasibility Reports.
• Selection of Turbine Generator Sets and other Electro-Mechanical Equipments.
• Design and Cost Estimation of Micro, Mini & Small Hydro Power Projects.
• Installation of Turbine Generator Sets and other Electro-Mechanical Equipments.
• Transmission and Distribution.
• Testing & Commissioning.
• Operation and Maintenance of Plant.
• Responsible of billing system of Community.
• Operators Training.
• Correspondence with vendors and suppliers.
• Supervision of Logistics.
• Coordination with Village Organization and SRSP.

کمپنی کا لوگو
Junior Electrical Site Engineer
DONG FANG ELECTRIC CORPORATION
جنوری ۲۰۱۳ - جون ۲۰۱۴ | Battagram, Pakistan

• Supervision and monitoring of erection/installation, testing and commissioning of all Electrical & Mechanical equipments.
• Check /inspect the consignment, materials, parts, and equipments prior to installation.
• Supervision of all electrical work in pressure channel, diversion tunnel & power house.
• Overview drawings as per site requirements.
• Prepare daily, weekly and monthly progress reports of all activities.

کمپنی کا لوگو
Traine Engineer
National Transmission and Dispatch Componay
جولائی ۲۰۱۳ - دسمبر ۲۰۱۳ | Peshawar, Pakistan

• At 500KV grid station i have worked with operation and maintenance staff to learn about grid Equipments and attended power transformer testing, general Structure of Grid Station.
• Current Transformer Potential Transformer, Circuit Breaker and Lightening Arrestor.
• Three Phase Power Transformer and Capacitor Bank.
• Differential, Distance, Over Current and Over Voltage Relay.

تعلیم

Abasyn University Peshawar
ایم فل, Master Of Science in Project Management‎
Project Management
مکمل
2017
CECOS University of Information Technology and Emerging Sciences
بیچلرز, بیچلرز ان سائنس, Bachelor of Science in Electrical Engineering‎
Electrical Power
CGPA 2.8/4
2012
Govt. Degree College
انٹرمیڈیٹ / اے لیول, فیکلٹی آف سائنس (پری انجینئرنگ), F.Sc Pre-Engineering‎
Mathematical Physics, Chemistry, Mathematics
فی صد 64%
2008
University Public School Peshawar
میٹرک / او لیول, سائنس, Matric in Science‎
Physics, Mathematics, Chemistry
فی صد 71%
2006

پیشہ ورانہ مہارتیں

ماہر Special Effects
ابتدائی Surge Protection
ماہر Technical Engineering
ماہر Tender Preparation
ماہر Tracking System Monitoring
متوسط Transformers
ماہر Troubleshoot Solar Installation
ماہر Troubleshooting Skills
ماہر Understanding Of Diagrams
ماہر Work under presuure
ماہر Xray Equipment Maintenance
ماہر المهارات الهاتفية

زبانیں

ماہر پشتو
ماہر اردو
ماہر انگریزی