Project Engineer from 06-04-2016 to date at Volka Food International Pvt Limited Multan,
Pakistan.
PRIMARY RESPONSIBILITIES:
Responsible for the E2E installation and commissioning of the plants including project planning,
initiating, Budget preparations, execution to handling of the line to production.
Key Responsibilities:
● Planning, scheduling, Equipment selection, briefing of overall Project.
● Utility maintenance, improvement and extension planning, execution and testing.
● Prepare, schedule coordinate and monitor the assigned Engineering Projects related to
Utilities division.
● Interact daily with the clients to interpret their needs and requirements and represent them in the
field.
● Perform overall quality control of the work (budget, schedule, plans, and Personnel’s performance)
and report regularly on project status.
● Cooperate and communicate effectively with General Manager Operation and other Project
participants to provide assistance and technical support related to field.
● Review engineering deliverables and initiate appropriate corrective actions on demand of client.
● Fully reviews drawings & specifications in preparation of subcontractor scope.
● Understanding contract documents and identifies gaps in the systems.
● Maintains and updates Purchasing Schedule to meet project timelines.
● Identifies lead times for materials purchases and tracks fabrication/ ROJ dates.
● Actively assists project superintendent with enforcement of site safety
● Pipe sizing, Rout mapping, isometric drawing layout, calculating BOQs, RFQs, Comparative
statements for equipment’s selections.
● HVAC System piping and duct designing, pipe sizing for Chill water, Hot water, Air, Gas, steam
and Condensate line sizes along with control mechanism.
● Installation 5.5 MW Wartsila Engine with its complete auxiliaries .
COMPLETED PROJECTS:
(Trainee Officer) (2016-2017)
● 1000 USRT Steam absorption Chiller (ST-1157 JH SAMJUNG) installation work supervision.
● Winkler+Dünnebier GmbH Jelly Plant utility supply including dryer, cooling screw and 30 drying rooms as Trainee officer.
● Utility piping layout, installation, erection for Production department Hansel Processing kitchen line for Éclair 1.5 TON/hr, Filly Line 750 Kg/h, Caotech chocolate line 1500kg/h, Bar Line with Hansel Processing kitchen 750kg/h and Aastad Denmark forming line , Boom Boom Bubble Gum utility supply for U1 Theegarten Pactec wrapping machines, and Preform Extruders.
Junior Executive/ Junior Project Engineer (2018-2019)
● Building B and B Extension HVAC system installation @1250 USRT cooling capacity Air conditioning system installation complete in all respect.
● PAVAN –Italy short cut Pasta line (3400 kg/h) utility installation, erection and commissioning containing gas Boiler, air cooled chiller and Reverse Osmosis Plant.
● 1650 USRT Shaungliang steam absorption chiller (ST-1653 HJ) installation, erection and commissioning including 3000USRT YUANHENG Cooling Tower.
● PAVAN –Italy LONG cut Pasta line (2400 kg/h) utility installation, erection and commissioning containing gas Boiler, air cooled chiller and Reverse Osmosis Plant
● Hansel Processing Hard Candy line 2000kg/hr. line utility lines layout, installation and erection work with specific control mechanism in Hot and Chill water piping.
● Pectin Depositing Toffee 1000 kg/hr. accompanied by Carrier Glycol chiller (250 USRT) and WDS Cooling Tunnel Erection, Installation & commissioning.
Executive Mechanical/Project Engineer (2020)
● Successfully installed and commissioned the Limitech ketchup and Mayonnaise line 1000kg/h, CIP chamber limitech, Volpak Filling line, FBL Cooling tunnel and other machines, it also includes design installation and design of HVAC including AHU,FCU, ducting, ventilation, steam, Ice water and etc.
● Responsible for E2E Installations and commissioning of Spice Grinding plant with 1000kg/h capacity including mixers, grinding machines, packing machines, Electric chiller of 274 ton capacity including air and steam piping as well.
● Successfully installed Fire Alarm system for Ketchup plant including design, technical comparatives, and installation and commissioning as well.
● Successfully installed and commissioned the Memak Chocolate Line 1000kg/h capacity containing all utilities as well.
Power House Project & Operation (3rd Aug-2020 -Continued):
● Responsible for the Installation of 5.5 MW Wartsila 16V32LN-5.5MW Engine including all its auxiliaries like Cooling tower, Fuel Booster unit, Turbochargers, Separator units and etc.
● Daily Based Operations and maintenance of Existing Wartsila 16V32LN-5.5MW & Wartsila 9R32-3.7MW.
Operational Responsibilities:
● To ensure/achieve maximum production by planning scheduled stoppages.
● Take corrective action during system operational disturbance and/or bring such disturbances to the attention of Superior.
● To continuously work for improving the operating life of the equipment and reduce the maintenance cost.
● To ensure that the stand by equipment is available for an immediate start up to eliminate production loss due to an emergency failure of the running equipment.
● In Operation I am responsible to prepare & maintain, daily Generation & Distribution Report, Reliability& Availability, Monthly, Annual Reports, Chemical Record, Engine Performance Sheet, Plant Control Sheet, SLC & SFC Reports…etc.
● Maintain/Track Power Plant statistical performance, production, root cause analysis and make suggestions/recommendations to the manager.
Maintenance Responsibilities:
● To study the operations and maintenance tasks on daily basis and make arrangements for in time execution for the job through field staff.
● Responsible to Perform maintenance both (Time based & Condition based.)
● To plan and carry out routine, preventative, Schedule & breakdown maintenance for all the engine and auxiliaries.
● To ensure that daily/weekly maintenance checks on the operating equipment are being performed accordingly...
● Maintenance & overhauling of all machineries in power plant such as Engines, auxiliaries, Cooling Towers, pumps, Coolers, Lube oil & HFO. Separators, Fuel Injection valves, injection pumps, Cylinder heads, tappet clearance, deflection of crankshaft, connecting rods, main bearing, pistons, turbocharger, charge air cooler, all types of filters, all types of valves, pre-filtration units, Starting air & Instrument air system, Compressors, Heat Exchangers, Radiators, Blower& Turbine washing, ventilation systems, storage tanks, and related equipment.

تعلیم

Virtual University of Pakistan
ماسٹرز, ماسٹرز ان بزنس ایڈمنسٹریشن, ‎
Management
CGPA 3.1/4
2019
Bahauddin Zakariya University
بیچلرز, بیچلرز ان سائنس, MECHANICAL ENGINEERING‎
Mechanical Design, Design and Manufacturing
فی صد 73%
2016

پیشہ ورانہ مہارتیں

متوسط Auto Cad
متوسط Cooordination Skills
ماہر End to End Project Management
متوسط Exposure to SAP
ماہر HVAC Maintainable
متوسط Leadership Collections Handling
متوسط Microsoft Project
متوسط MS Projects
ماہر Plant Maintenance
ماہر Plant Management
ماہر Project Engineering
ماہر Trane Trace

زبانیں

متوسط انگریزی