8 Years of Experience in Telecom Industry, working with tough schedules giving output within Time frame & quality. I have been involved in various 2G, 3G/WDCMA, 4G/LTE, RF, Rollout, Expansion, Up-gradations, Maintenance, Rectification of Huawei, Ericsson & Nokia Projects. I have managed teams in challenging environments, have a record of accomplishment of challenging tasks. I have good knowledge of Contract negotiation, Project cost estimation, Project preparation, Technical recruitment Vendor Management, and Site management.
Specialties- Project Rollout Specialist. Swap Project Specialist, Project Initiation, Planning, Execution, Monitoring, Control, and Closing, & Rectification
• Supervise Installation & commissioning of Complete Nokia Equipment including RF modules, Optical Fibers, Flexi-BTS, RRU’s, etc.
• Supervise Up-gradation of NOKIA Flexi-BTS(FSMFA), RRU’s & RF Modules.
• Troubleshooting & rectification of all issues related to BTS site including hardware fault.
• Rectification of AFR, RSSI, LTE_RTWP, WCDMA_RTWP, MIMO_L1800, MIMO_L850.
• Rectification of Partial swap, cross swap, sector swap.
• Responsible for site On-Air (2G, 3G/WCDA, 4G/LTE) after rectification of all issues related to the site.
• Supervise installation, patching, & configuration of alarms for ZTE cabinet, NIAN Rectifier Old Rack, NIAN Rectifier new rack, & Nokia Flexi BTS.
1- Responsible of Commissioning and integration of Nokia FSMFA System Module (3G / WCDMA, 4G/LTE) using Nokia BTS Site Manager & SBTS.
2- Responsible of Swap from ZTE to Nokia Equipment.
3- Upgrading of Node-BS SW & Clearing of Node-B and RNC alarms.
4- Providing technical support tasks including fault diagnosis & troubleshooting of 3G Flexi BTS.
5- Manage, lead and delegate RAN/RNC tasks.
6- Leading and supervising other members of the BTS/Transmission implementation team.
7- Responsible for scheduling workload and providing project status to project manager.
8- Expert in performing routine BTS commissioning, integration, acceptance, expansions, reconfigurations, upgrade of hardware & software and maintenance of BTS.
9- Proven ability to troubleshoot actual and potential problem arises in BTS, 3G/WCDMA, 4G/LTE BTS.
10- Working on NOKIA-LUCENT MW Links, ( Installation, Link Alignment, Configuration, Visibility & Supervision).
11-Compiling daily progress reports.
I have hands-on experience of following Transmission-links,
• Nokia Lucent
• NEC NEO
• NEC PASSOLINK
• RTN(610, 620,etc.)
• Traffic-Node (TN-2p up to TN-20p)
Details:
1- Trouble shooting of NEC microwave links by using PNMT software. Troubleshooting of IDU & ODU.
2- Resolving the issue regarding microwave dishes alignment/panning using different tests. Performing the interference test.
3- Communication path verification from hop to hop in case of site down due to media issue.
1- Telecom Implementation of major Projects i.e. 2G, 3G, LTE, IBS Survey / Implementation, IT-Tasks, RAN Rollout Project, 2G-Off-load Project, Telecom Material Supplies, Huawei / Ericsson SWAP project.
2- Coordination with Warid Management and Technical teams.
Completed RAN Rollout Project of Warid Telecom in 2015 with-in time frame.
3- Responsible for the Initiating, planning, executing, monitoring and controlling 2G, Micro-Wave, Hardware Up-Gradation, SWAP and Expansion projects.
4- Compiling daily progress reports.
5- Develop an excellent working relationship with the customer and supplier base. Prepare Material Request and follow up the equipment delivery on sites.
6- Supervision of Installation and Commissioning of Ericsson RBS as per plan specification, monitoring and rectifying RBS related faults. Expansion/Up gradation of RBS 2000/6000 family (2206, 2207, 2106, 2107,2216, 2116, 6000,6102, and 6201).
7- Supervision of Installation and commissioning of Huawei 3900A, 3012(indoor), 3012AE(outdoor)
8- Supervision of MW link configurations as per provided LB.
9- Supervision of Installation and to perform commissioning and integration of Ericsson COW (cell on wheels) mobile BTS.
10- RFI (ready for installation) and TSSR visit for new site installation.
11- Trouble shooting of RBS alarms like VSWR, RX Diversity, RF loop test, CDU faults with the help of OMT and tools like Site master and BERT.
12- Performing LOS surveys and implementing LOS reports for COW (Cell on wheel).
13- Support, create and execute customer acceptance test procedures (ATP’s//PAT).
14- Coordination with Field teams and provide them technical support regarding BSS/MW problems.
1- Performed Corrective and Preventive maintenance(CM/PM) of Power and telecom related equipment in CI Region.
2- Hands on experience for maintenance and troubleshooting of Generators up to 1000 KVA includes Perkins, John-deer, Siemens and NEQ Generators.
3- Worked on batteries including battery test, installation and replacement also in case required. Supervise contractors for the overhauling of Genet’s.
4- Supervise trouble-shooting of Auto Transfer Switches (ATS), and Air-Conditioners & Distribution Panels (DP) In BTS Rooms at Mobilink sites.
5- Supervise Huawei Power-cube Installation/SWAP Project at Mobilink Sites.
6- Supervise Motorola to Huawei SWAP Project in remote area in 2011-2012 at Mobilink sites. Compiling reports as Team-lead.
1- On-call Support at 1218 for PTCL broad band users.
2- Configuration of all type of PTCL Wi-Fi Modems.
3- On-call support for PTCL smart-TV users.
4- Troubleshooting of technical problems of PTCL users.
1- Coordination system development tasks to include design, integration and formal testing of Telecom & IT equipment.
2- Develop and complete actions in system specifications, technical and logistical requirements and other disciplines.
3- Create and maintain programmatic and technical documentation to insure efficient planning and execution of Tasks.
4- Manage document system configurations.
5- Daily progress report sharing with Project Manager.