Responsibility. Ccv line checking the check list and mechanical maintenance issues rectify . Copper tape machine maintenance perform equipment inspection the pay off take up caterpillar daily checking the check list . Uygar machine all mechanical maintenance problem rectify. 2800 D/T pay off to take up all maintenance perform. Preventive maintenance planning and check the vibration and temperature
Daily check equipment as per company check list. Take temperature with temperature gun.take vibration with adash tool. Condition monitoring of plant. Replacement the O Ring, lip oil seal bearing and gear box overhauling. Replacement pneumatic fans impeller and pulley alignment, conveyor roller bearing block and chain sprocket change and impeller balancing and manage the spare ready. Hydraulic pumps maintenance preventive, corrective maintenance. Troubleshooting of mechanical equipment and conveyor maintenance. Any abnormal sounds check of the equipment with testo scope. Suction flow check of lines with flow measureing tool.Motor RMP check tecometer.gear ratio check.all type of maintenance in running plant. Monthly update the machine history Attend training session with German,s and Malaysians.
All check list and work permit checking (shutdown T/A 2019)
IMO robot machine installation and ma in maintenance work on machine
ARL P#0563 up graduation project.Responsibility.pipe fitting heavy equipment installation and structure erection