خلاصہ

Being the part of working organizations, I might be considered as an energetic and self-motivated candidate that can provide support in terms of initiator and leadership skills. I possess strong numerical, analytical and problem solving skills. In addition to that, a blended research oriented profile is the important part of my resume. My ability of quick learning, dedication and willingness of taking responsibilities have always proved me the most profitable asset of organization.

تجربہ

کمپنی کا لوگو
ARE-Assistant Resident Engineer
Halcrow Pakistan Pvt Ltd
ستمبر ۲۰۲۰ - موجودہ | Karachi, Pakistan

Project: Construction of Yard, Building, Powerhouse, Railway Track and RNAF at South Asia Pakistan Terminal south wharf Karachi.
Consultant: Halcrow Pakistan Pvt Ltd.
COntractor: China Harbour Engineering Company.
Key Responsibilities:-

Responsible for administration of construction works cover in contract and assist the SRE-Senior Resident Engineer with the prompt exchange of correspondence (Emails & Letters), technical queries, submittals, and RFI\'s to all contractors. Orient, assign and supervise the construction inspection staff on a daily basis so that all contractor activities are adequately covered without any delay.
Supervise and remain vigilant regarding all aspects of the construction activities. Respond with appropriate and necessary levels of construction supervision to provide quality assurance in accordance with contract documents and Project Specification.
Coordinate the interface of the construction work with other contractors on the site. Orient inspectors to verify that contractor is following his approved site Health & Safety plan.
Assist the SRE and QS team in negotiations with the contractor’s claims and variations orders or changes in the schedule of the deliverable.
 Review the contractor\'s progress at all times. Monitor the material incorporated in the work, the materials stored at the site, and the contractor\'s manpower and equipment debuted at the site.
Attend weekly, monthly, and other progress meetings held at the site as required by the SRE. Identify constraints and recommend corrective measures.
Review inspector\'s daily reports and preparation of engineer\'s daily diary, and general oversight of inspector\'s daily activities including works assignments, on-site performance, and guidance on the supervision of the contractor\'s operations.
Coordination with contractor\'s supervisory personnel regarding construction schedule, sequence of work based on the activities related to each other, and method of statement of any new activity.
Continuous inspections and consultation with the SRE including the preparation of written and oral reports to the Client on contractual and procedural matters.

کمپنی کا لوگو
Project Manager
Petrocon (Pvt) Ltd
ستمبر ۲۰۱۸ - ستمبر ۲۰۲۰ | Karachi, Pakistan

Project Intra Piping Upgradation Project EJHD Shell Pakistan (PVT) Ltd at Karachi Airport,
Client : Shell Pakistan (Pvt) Ltd,
Consultant : Petrochemical Engineering Services (Pvt) Ltd.

To Monitor the Overall management of construction activities involves (Construction of Civil & Mechanical works of Pipe supports and pipe Sleepers, Erection of Plant Piping networks on header and on Pipe racks structure, Construction and installation of all loading and unloading pumps , construction of Pre-engineered and cast in situ box culvert, valve Pits and hydrant pits etc. starting from Planning, execution and monitoring on daily basis with project team of all engineering projects directly and through subordinate staff for the following:
• Monitor construction schedule of all different projects.
• Monitor and Manages S-curves on basis of approved construction schedule from consultant/ client for monitoring of project progress and update weekly basis.
• Monitor daily reports and submit to client/ consultant on daily basis.
• Monitor weekly report and submit to client/ consultant on weekly basis with updated construction schedule.
• Monitor monthly report and submit to client / consultant on monthly basis.
• Monitor and Management of cost estimation on monthly basis for next month site expanses.
• Weekly progress review meeting on weekly basis with client / consultant.
• Fortnightly meeting on every two weeks with higher management of PETROCON with clients and consultant to resolves the higher level issues and finical issues.
• Close coordination with consultant on daily basis for smooth execution of construction activities.
• Review and monitor the invoices against work done to client /consultant every month

کمپنی کا لوگو
Deputy Project Manager/ Planning Engineer
PETROCON (PVT) LTD.
جولائی ۲۰۱٦ - اگست ۲۰۱۸ | Karachi, Pakistan

Project: Upgrading of Lubricant Blending Plant, Chevron Pakistan (PVT) Ltd at
Consultant : ZIASHAN ENGINEERS (PVT) LTD.
Key Responsibilities :

• Overall management of construction activities involves (Construction of Civil & Mechanical Works of Additives tanks, Construction of civil and mechanical works of Pipe racks and erection of pipe racks structure, Erection of Plant Piping networks on header and on Pipe racks structure, Construction of Dyke wall around all new and old additives tanks, Construction and installation of all loading and unloading pumps , construction of Pre-engineered building complete and Construction of Additives Decanting bay)starting from Planning, execution and monitoring on daily basis with project manager of all engineering projects directly and through subordinate staff for the following:
• Prepare construction schedule of all different projects.
• Prepare S-curves on basis of approved construction schedule from consultant/ client for monitoring of project progress and update weekly basis.
• Prepare daily reports and submit to client/ consultant on daily basis.
• Prepare weekly report and submit to client/ consultant on weekly basis with updated construction schedule.
• Prepare monthly report and submit to client / consultant on monthly basis.
• Prepare cost estimation on monthly basis for next month site expanses.
• Weekly progress review meeting on weekly basis with client / consultant.
• Fortnightly meeting on every two weeks with higher management of PETROCON with clients and consultant to resolves the higher level issues and finical issues.
• Close coordination with consultant on daily basis for smooth execution of construction activities.
• Prepare bill of quantities and raise demand of material for site construction works.
• Daily tailgate meeting conduct with Project Manager and all subordinate staff for smooth execution of construction works.
• Prepare and submit invoices against work done to client /consul

کمپنی کا لوگو
Project Manager
PETROCON (PVT) LTD.
جون ۲۰۱۵ - جولائی ۲۰۱٦ | Karachi, Pakistan

Project: 32.8 MW Power Plant at South Asia Pakistan Terminals (Deep Water Container Port, Phase-1)
Consultant HALCROW (International & Pakistan)
Key Responsibilities :
• Overall management of construction activities starting involves ( Civil and mechanical wok of diesel storage tanks, Piling works and pile caps under the Engine foundations, Tanks and Power house building) from Planning, execution and monitoring up to hand over of all engineering projects directly and through subordinate staff for the following:
• Contracts Management and Outsourcing of different types of civil and mechanical works.
• Safety and Environmental Management with goal of zero accident and proactive approach for environment.
• Monitor all projects related works at site and ensure construction in accordance to the specifications and established standards, procedures and quality.
• Monitoring of quality assurance parameters for the project.
• Reporting progress on daily/weekly/monthly/quarterly basis.
• Verification of sub-contractors bills and claims related to escalation
• Coordination with internal departments for site design including concept site layouts and their approval from CEO and chairman.
• Coordination with consultants for the preparation of detailed drawings and amendment &revision of drawings according to site condition.
• Pursuing/coordination for timely completion of project activities with consultants and subcontractors.
• Maintenance of discipline, distribution of work among subordinate staff.
• Any other duty assigned by the management. Divided massive construction project into small and easy steps, enabling engineers to perform their functions as per their area of expertise.
• Arranged work-force as per requirement of project and dispatched schedule to subordinates.
• Ensured all construction processes were completed as per safety and quality guidelines.
• Attending follow up meeting with engineers from the consultants to report the project progress and

کمپنی کا لوگو
Project Engineer
PETROCON (PVT) LTD.
جنوری ۲۰۱۳ - جون ۲۰۱۵ | Karachi, Pakistan

Project: 32.8 MW Power Plant at South Asia Pakistan Terminals (Deep Water Container Port, Phase-1)
Consultant HALCROW (International & Pakistan)
Key Responsibilities :
• Executing and supervising all construction activities including earthwork, form work, steel works, water proofing and concreting activities and assuring the practices comply with the desired plan and design
• Supervising of Soil investigation works. ( 5 bore holes)
• Supervising of piling works and Pile Load test on working piles.
• Supervision and execution of Drainage system.
• Supervision and execution of Heavy traffic road (Flexible and rigid pavement)
• Supervising of erection work of steel structure building of powerhouse with wall and roof cladding (sandwich panels) imported from China.
• Coordinating between structural and architectural drawings and communicating with project stakeholders (Client, Consultants)
• Planning with project manager the goals to be achieved and scheming the scope to do per day
• Conducting follow up meeting with engineers from the consultants to report the project progress and assurance of abiding the quality standards during the construction and to attain certain approvals
• Establishing site works Methodology/Method of statement, identifying and arranging on-site resources to be used.
• Preparation of site procedures and quality control formats.
• Interpreting complex engineering design documents, specifications and drawings
• Preparing and forwarding work inspection requests to consultants.
• Using Auto Cad to handle drawings and co-ordination with design consultants and project planning team and making shop drawings.
• Constrains and their solution and Preparation of bar bending schedules.

کمپنی کا لوگو
PROJECT ENGINEER
GULZARI ASSOCIATES
جنوری ۲۰۱۲ - جنوری ۲۰۱۳ | Karachi, Pakistan

Key Responsibilities:-
• Executing and supervising all construction activities including earthwork, formwork, steel works, water proofing and concreting activities and assuring the practices comply with the desired plan and design
• Supervision and execution of building works including Isolated and combined foundations, plinth works, super structure works (Columns, beams and slabs) and UG water tank and OH water tank for, foul water system, drainage system, fresh water system and drainage system of small society for the name of Up-gradation of KINPOE infrastructure KANUPP Karachi.
• Planning with project manager the goals to be achieved and scheming the scope to do / day.
• Estimation of bill of quantities.
• Preparation of bar bending schedules and verified by consultant.
• Site inspection and supervision.
• Preparation of site procedures and quality control formats for approval from consultant.
• Preparing and forwarding work inspection requests to consultants
• Effective task management.
• Health, Environment and safety issues.
• Total Covered Area of the Project is 154860 Sq. ft.

کمپنی کا لوگو
TRAINEE ENGINEER (QS)
KAIFF CONSTRUCTION COMPANY
جون ۲۰۱۱ - ستمبر ۲۰۱۱ | Karachi, Pakistan

CONSTRUCTION OF ARIF MANZOOR HOSPITAL DHA PHASE VI Karachi.

کمپنی کا لوگو
TRAINEE SITE ENGINEER
FRIENDS SYNDICATE (PVT) LTD
مارچ ۲۰۰۹ - جون ۲۰۰۹ | Karachi, Pakistan

Project: Jail Chowrangi Flyover University road, Karachi

تعلیم

NED University of Engineering & Technology
ماسٹرز, ماسٹر آف ایجوکیشن, Masters in construction management‎
Engineering Management
CGPA 3.6/4
2021
Sir Syed University Of Engg. & Technology Karachi.
بیچلرز, بیچلرز ان سائنس, BS ( Civil Engineering )‎
Civil
CGPA 3.3/4
2011

پیشہ ورانہ مہارتیں

ماہر Civil Planing
ماہر ETAB
ماہر Handling Assignments
ماہر Instruments Drawing
ماہر LTN
ماہر NAVISWORKS 3D
ماہر SAFE

زبانیں

ماہر اردو
ماہر انگریزی