A resourceful and accomplished individual with approximate 3 years of comprehensive experience in Mechanical Engineering. Very effective in providing detailed feasibility report study, Project management, Estimation and Engineering Design support compliant to Department’s mission and procedures. To obtain a position that will enable me to gain experience and develop my skills and knowledge in a people-oriented organization.
<div><p> Infrastructure works of PEARL and REEF Towers (EMAAR Pakistan)</p>
<p> Leading the infrastructure project PEARL AND REEF TOWER with EMAAR Pakistan</p>
<p> Coordination With Hill Int. and Emaar Pakistan Officials.</p>
<p> Installation Sewerage treatment plant </p>
<p> Installation Fire Pump Room,</p>
<p> Coordinate with direct construction workers and subcontractors</p>
<p> Review the work progress on daily basis</p>
<p> Installation, Testing and commissioning of Air handling Unit.</p>
<p>Installation, Testing and commissioning of Cooling Tower</p>
<p>Installation, Testing and commissioning of FCU ,Hydrostatic / Pressure Testing of pipe</p>
<p> Review Drawings material submittals and method statements</p>
<p> Work Estimation and Planning</p></div>
Erection of Air handling Unit
Erection of cooling tower
Assembling of pipes
Erection of chiller
Maintenance of HVAC Equipments
Maintenance of Boiler
Comissiong of of cooling tower
Chiller comissiong and Erection
Maintenance and Callibration Engineer at premier tubular inspection service , have to maintain the equipment and have to callibrate the equipment of oil and gas company
Winter Internship for a period of three weeks. Analyzed the layout of power generation cycle incurring in 4 power units developing the net total of 800 MW electricity together with the refrigeration chillers operating on vapor absorption cycle using the steam extracted from Low stage turbine.
Perform engineering work related to configuring, deploying, maintaining and upgrading CAD models.
Design, develop and engineer high quality models using 3D and 2D CAD tools.
Produce designs that meet targets for feasibility, performance, costs, quality, safety, legislation and timing.
Ensure that all work carried out is in compliance with company design, safety, quality, environmental compliance and proceduralstandards
I was trainee there to work with machines and fabrication process
Two Week Winter Internship
Tutorial and workshop sessions to address the design, operation and maintenance of boilers, as well as boiler theory
Operational and maintenance issues associated with extraction plant, extraction processes, terminology and measurement techniques
Work out on Efficient Use of High Pressure and Process Steam
Extraction Theory and Practice for Milling Engineers
Introduction to Extraction for Shift Supervisor
Steam Generation