خلاصہ

fresh electronic Engineer looking for job

تجربہ

کمپنی کا لوگو
Sub Engineer
Danish Brother & Contractor
جنوری ۲۰۱۷ - نومبر ۲۰۱۸ | Karachi, Pakistan

Working in Substation Maintenance (East &South) Effectively working in VCB (Vacuum Circuit Breakers), OCB (Oil Circuit Breaker), J&P, Fico PMT, (Pole Mounted Transformer) (English OCB switches).C/T (Current Transformer) and (VCB Switch Cooling Pipe and Contact ) E.F.I. (Earth Fault Inductor And Installing) P/T HRC Fuse, and L.T Breaker, L.T H.T Bushing Transformer, H.T Bus Bar, and, Bus Bar side shroud, Cable Side Shroud, Taping of Transformer, Temperature Meter, Taping Of Transformer Protection Relay, Replaces and installation, PMT complete in Installed. Etc. All Complete Maintenance Pmt ( D/O Cutout, Pin Insulator, Pmt, Check Metter, H-T Basbar, All Leads, D/B Box HRC Fuse Replace, L.T H.T Bushing Top Plate H-T Jumper Replace With line Tape Punch. (D/O Cutout, D/B Box L-T Breaker Pmt Earthing Complete Main Earth Connected). All Complete Maintenance Substation ( Switch, Trolly Contact, Transformer L.T H.T Bushing Top Plate, All leads, H-T Cable, L-T Pannel HRC Fuse/Bace Replace L-T Side All Leads, Shroud, Basbar , (Switch ,Transformer And L-T Pannel Earthing Main Earth Connected) ,Trunch, Civil Work, Door We installed H-T Cable 11000 KVA Jointed. We installed H-T Cable 11000 KVA Complete Termination & Lugs 300mm Safety First (Helmet, Chin Strip, Harness Belt, (Rubber Gloves, Leather Gloves 11000 KVA), Safety Shoes, Uniform Yellow Short & Ground 11000 KVA.) New Switch (L.B.S) We Installed Load Break Switch………

تعلیم

Mehran University of Engineering & Technology
سرٹیفیکیشن, engineering‎
Electrical Engineering Electronics
مکمل
2016

پیشہ ورانہ مہارتیں

ماہر Handling Assignments

زبانیں

متوسط انگریزی