Dedicated and results-driven Civil and Environmental Engineer with a passion for enhancing water, sanitation, and community physical infrastructure (CPIs). Experienced in various roles including Project Manager, Resident Engineer, Consultant Engineer, Field Engineer, SDO and Site Engineer. Skilled in WASH, building infrastructure new and renovation, water supply, water distribution networks, water mains transmission lines, diversion structure, surface and overhead water tanks, check dams, irrigation works and solar system, roads and bridges work. Proven ability to work independently and as part of a team. Eager to take on new challenges and continuously learn.
1. Recruitment of sub contractors 2. Interviewing the candidates for specific job roles 3. Plan and manage all the components of project 4. To oversee all the activities in field 5. Meetings with clients and consultant staff at various points related to projects 6. Plan and organise activities time slots and budgets 7. Solving the problems encountered in field 8. Knowledge of FIDIC and Cluases
1. To verify contractors running account bills and final bills
2. To visit sites and resolve problems as per site technically
3. To submit monthly progress reports and briefs
4. To assess the quality of the materials used at site
5. To verify the materials as per the approved material list used at site
6. To initiate the variation orders
7. Conducting comprehensive assessments of health facility infrastructure to formulate effective intervention plans in accordance with ICRC guidance.
8. Collaborating closely with the Department of Health (DoH) and ICRC to prepare, refine, and finalize Bills of Quantities (BoQs), drawings, and designs tailored to on-ground requirements.
9. Assisting and closely monitoring the bidding process and contract award phases to ensure the selection of qualified contractors for civil works related to Point-of-use (PiB) water treatment, water cooler installations, sanitation, drinking water facilities, renovation works, and solar system installation.
10. Facilitating the timely completion of planned work, proactively identifying gaps, and promptly communicating issues to all stakeholders for immediate solutions.
11. Providing vigilant supervision and monitoring of contractor activities, meticulously tracking progress and quality, and maintaining comprehensive data and pictorial records.
12. Coordinating effectively with DoH officials at the district and provincial levels, as well as collaborating with relevant stakeholders.
13. Conducting regular visits to targeted health facilities and consistently reporting on rehabilitation activities, offering monthly and periodic inputs.
1. To prepare daily progress report
2. To submit weekly progress reports and brief
3. To prepare a time and management plan for a project
4. To prepare presentations
5. Do cost analysis
6. To prepare IPC\'s
7. Prepare shop drawings
8. Do estimation
9. prepare BOQ, Measurement sheet, project Inventory
10. prepare a request for quotation (RFQ) for the sub-contractor for the award of the contract
11. prepare bidding documents
12. Oversee all the 13 project sites, properly and pay special attention to the quality of the material, and assist the staff while providing technical solutions.
13. Also done oxygen distribution systems installation in Sheikha Fatima Bint-e-Mubarak Hospital at Wana (SFBMH)
14. Update and prepare the financial status of the project every week
15. Take a drone pictorial view every week to show the progress and share it with the higher authorities
16. Prepare the PC-IV Hand on taking documents and submit them to the higher authorities
17. Prepare Proposals for the projects
18. Monitor all the project sites
1. Frequently visiting the site and checking the undertaking activities at site whether it is running as per drawing, time frame and budget.
2. Meeting with higher authorities upon site issues and their proper solution.
3. Writing daily, weekly, monthly progress report and sharing the same with higher authorities.
4. Verifying the running bills of the contractor.
5. Viewing the test reports and evaluate the same whether it is as per code of Pakistan building code 2007.
6. Evaluating the quantity and quality of the material used at site.
7. Issuing notices to the contractor upon not following the time frame.
8.Conduct drawing and design variations as per site topography.
1. Site visit and addresses the issues on site and find solution for the same issue.
2. Coordinate with team and hand over tasks to the team.
3. Performing tests on site and prepare the document record of the same.
4. Keeping in view the quality and quantity assurance checking whether it\'s within the scope and budget of the project.
5. Prepare daily, weekly, and monthly progress reports and share them with higher authorities.
6. Preparing the running bills and verifying the same from the district engineer (Hum Qaddam NGO).
1. Frequently visit the listed villages with social organizers and ask about the problems relating to WASH and address their solutions on a flip chart.
2. After enlisting the problems ranking the same on a flip chart involving the community members.
3. Arrange a grand meeting with the stakeholders and community members about the listed problems.
4. Collect feasibility data during visiting the villages to prepare BOQ and estimation for the same.
5. Assess the drinking water quality by performing tests at the laboratory whether or not according to the WHO standard.
6. Do for the same design i.e. for water supply, sanitation, and storage.
7. Also do for watershed management and DRM.
8. Lead and oversee the implementation of WASH and CPIs interventions, including water supply schemes, rainwater harvesting, check dams, and irrigation water channels construction.
9. Ensure the quality execution of projects in line with the organization\'s strategy and project specifications.
10. Conduct technical feasibility assessments, including site identification, resource planning, and cost-effectiveness analysis.
11. Coordinate with local communities, government authorities, and project stakeholders to secure approvals and resources.
12. Monitor project progress, identify and resolve technical challenges, and ensure compliance with safety protocols.
Maintain comprehensive project documentation, including drawings, reports, and quality control records.
13. Collaborate with cross-functional teams to optimize project outcomes and address construction issues.
14. Provide technical assistance and capacity building to communities on WASH and CPIs-related matters.
15. Prepare and submit regular project reports and updates to management and donors.
16. Ensure adherence to humanitarian standards, engineering codes, and best practices in project execution.
17. Manage project budgets and procurement activities to maximize efficiency and cost-effectiveness.
1. Site visit and address the issues on site and find the solution for the same issue.
2. Coordinate with the team and hand over tasks to the team.
3. Performing tests on-site and preparing the document record of the same.
4. Keeping in view the quality and quantity assurance checking whether it\'s within the scope and budget of the project.
5. Prepare daily, weekly, and monthly progress reports and share them with higher authorities.
6. Preparing the running bills and verifying the same from the district engineer.