It is my ambition to work in the engineering industry and gain ‘Professional Engineer’ status. Math and Science have always been my favorite subjects and during my study, there was something that sparked my interest and has continued to engage me ever since. The ability to apply what I have learnt in the classroom to the outside world is an aspect of physics and math that I particularly enjoy.
Responsible for
1- Maintaining the efficiency and reliability of assets at lower cost with optimum utilization of resources.
2- Keeping Check on water, Compressed air , Coal and fuel consumption.
3- Installation of new machinery and energy load.
4- Planning and execution of Preventive and Corrective Maintenance of Plant equipment and machinery.
5- Generators, Compressors, Air Dryers and Boiler Maintenance.
6- TPM implementation. 7- Energy efficiency and conservation.
8- Preparing BOQ for in-house projects and installations.
9- OEE Availability calculations and improvement.
10- Environmental conservation activities.
11- Successful internal & external Audits
1-Participated In TPM implementation & OEE calculation
Systems.
2-Performed Root Cause Analysis of the 6-months data of
Maintenance Dept.
3-Got Practical knowledge of Maintenance of machines.
4-Learnt How the Availability of machines can be increased to get Higher OEE.
it was 2 weeks internship and i worked in 3 main Sections of Millat Tractor Limited.
1.Engine Assembly Department
2.Manufacturing Department
3.Tractor Assembly Department
i did work in various workshops of Pakistan Railways like Spring manufacturing workshop,diesel engine workshop,small components manufacturing workshop,calibration workshop etc.