To embark on the professional carrier as Safety Engineer using my technical, administrative, research, and unique leadership qualities; I am looking for a disciplined organization to contribute magnificently to its success and to polish my skills professionally.
Conducting Toolbox talks on a daily basis.
Ensure that all the workers use the relevant PPE’s in their work.
Final inspection of the scaffold prior to initial occupation for use.
Ensure double lanyard full-body safety harness worn by people properly.
Recording and display of safety reports and statistics.
Ensure the presence of fire extinguishers at hot work.
Prepared the Risk Assessment of the whole project.
Prepared the lifting plan of the crane before lifting the load.
Conducting Safety meetings.
Ensure that the route that needs to be taken is free from obstacles or hazards and has adequate lighting.
Ensured the working area must be barricaded and warning signage must be displayed.
All Equipment will be checked by the client and tagged before utilization. Supervision of housekeeping and environment clean-up activities.
Organizing meetings for hazard identification, prevention, and control. Ensure that equipment are adequate for workers on site.
Report emergency situation on-site (accident and incident).
Hearing protection (ear-plugs) will be used by relevant manpower.
A person must be trained for fire fighting in case of emergency fire fighting and his presence must be ensured at the site all the time.
Establish emergency procedures and evacuation plans, assist in implementation.
Monitor Permit-to-Work and conduct training on PTW systems.
Conduct random on-site safety inspections.
Conducting Safety meetings and Tool Box Talks.
Ensure effective compliances with PTW System.
Carrying out daily safety inspection, preparation of daily safety report.
Accident/Incident Investigation and record keeping.
Coordination with site team and other departments.
Conducting and preparing of Risk assessment for different jobs. Respond to emergency procedure.
Ensure the presence of fire extinguishers at the place of hot work.
Inspection of equipment and ensure the tagged equipment should be used and present at the site.
Ensure that the lines should be properly flush by steam before starting the welding procedure.
Notice the proper insulation of pipes so that the oil in pipes could not freeze and lines should not stuck the oil passage.
Workers must wear proper PPE, i.e. Safety Helmets, Safety Shoes, Safety Gloves and Vest during the manual handling.
Ensured the working area must be barricaded and warning signage must be displayed.
Verified that all workers were properly outfitted with hardhats and safety vests.
Strict implementation of better housekeeping at site.
Education startup funded by Stanford University that in order to develop business skills (e.g., communication, leadership, problem solving, teamwork).
Analyzed Different water purification sections of plant and working of cooling tower. Worked in Demineralization plant and Reverse Osmosis plant