I am an Electrical Engineer with 8 years of professional experience, working with Local and Multinational companies within and outside Pakistan.
Following is brief summary of my experience:
Worked as Project Electrical Engineer. UCH‐2 Combined Cycle power plant 404MW in Pakistan with Hyundai Engineering & Construction.
Worked with Doosan Heavy Industries & Construction Ltd. Saudi Arabia, as an Electrical & Instrument Engineer commissioning in Qurayyah Combined Cycle Power Plant (4000MW). After completion of commissioning activities and achieving successful COD of the plant I was engaged with O&M team to look after complete O&M activities including Balance of Plant & Power island.
Worked in Iraq as an Electrical commissioning Engineer with Shamara Holding Group in Shat‐Al‐Basra 1250MW Mega Deal Project.
Worked as QA&QC Electrical Engineer at 50MW Gul Ahmad Wind Power Plant, Jhampir with Descon Engineering Limited
Worked as QA&QC Electrical Engineer at 74MW Etihad Power Cogeneration Project, Rahim Yar Khan, Pakistan, with Descon Engineering Limited
Currently working as Lead QA&QC Engineer at EPC Division with Descon Engineering Limited.
Worked in different power plants which includes cogeneration power plants, wind power plants and industrial projects.
Worked as an Electrical and Instrument Engineer. Involved in execution, testing and commissioning of complete E&I systems at 1250MW Shat-al-Basra, open cycle power plant in Basrah, Iraq.
Instrument and control commissioning engineer at 4000 MW Qurayyah Combined Cycle Power Plant. Involved in commissioning of field instruments and GE Mark VIe DCS control system.
Worked as project electrical engineer at 404 MW UCH-2 Power Plant in Balochistan.