To use the best of my analytical skill in a challenging work environment of reputable organizations; for the fulfillment of corporate goals.
Responsibility
Watch electrical parameters like frequency, voltage, KW, P.F, KVAR, and maintain these
parameters.
Watch mechanical parameters like cylinder temp, main bearing temp, turbo temp and maintain
these parameters
Watch and maintain lube oil temp, pressure and protection limits
Watch and maintain cooling water temp, pressure (HT,LT)
Watch and Maintain Auxiliary of power plant like current and voltage
Watch and maintain synch condition (AUTO,MANUAL)
Watch WHR Boiler parameters like Temp, pressure inlet water from economizer
Watch WHR Boiler Generated steam and SUPER HEATED STEAM temp , pressure
Termination of cooling tower fan motors
Reading the Electrical Drawing and Troubleshooting the faults
Install the ACB, VCB SF6
Prepare the lists Electrically Modules
Reviewing the Electrical IFC drawings for the project.
Supervising the Implementation of Structured Cabling system (SCS) and outside plant Cabling system.
Preparing request for inspection for internal inspector for the Electrical work.
Updated the drawings (Redlined) as per the actual Construction for as building the same.
Operation and maintenance of 132/400 KVA transformers
Managing the MDI connection of industries.
Balance the load on transformer by OLTC/NLTC techniques.
Site survey and shutdown operation Validation.
Monthly reporting on phase dis-connected,dead defaulters.
Identification of corona affected faults Temporary/Permanent short circuit faults.a