I have experience in production , quality control and quality assurance in manufacturing industry.
Responsibilities:
Developed and implemented preventive maintenance plans to minimize downtime and maximize equipment efficiency.
Conducted troubleshooting activities to diagnose and resolve equipment malfunctions and failures
Coordinated with production and quality control teams to schedule maintenance activities and minimize downtime
Developed and implemented maintenance procedures, checklists, and documentation
Managed the utilities, such as steam, pumps, compressors, and heat exchangers to ensure their availability and optimal use in plant operations
Coordinated with the procurement teams to ensure the timely delivery and managing maintenance budgets
Responsibilities:
Managing and overseeing the daily operations of the production toensure that all production goals are met.
Ensuring that the production processes are efficient and effective, and identifying areas for improvement.
Monitoring production costs and implementing cost-saving measures where possible.
Ensuring that all production records and reports are accurate and up-to-date.
Troubleshooting problems in the production line
Perform root cause analysis for detecting faults and developed corrective actions.
ImplementedKey Performance Indicator.
Responsibilities:
Comprehensively control and coordinate the personnel management and production activities of the production department.
Assigned production plans and tasks, arranged and controlled the production schedule
Tracked the production situation, product demand, production process, output target., and completed the production target on time.
Respond to abnormal production in time, track problems in time, and put forward reasonable suggestions.
Participate in the action plan and implementation of improving production efficiency and product quality.
Monitor the standard operation methods to ensure the safety of the production site.
Experience in steel works is preferred.
Supervising the project and ensure completion of the work on time and in compliance with companys safety standards
Preparing Construction Method statement for Structural Erection works and Quality documents required for inspection.
Adhering to QCP, Project specification, and various standards on inspection
Ensuring availability of resources and manpower for completion of Set targets within estimated man-hours.
After completion of project successful commissioning.
As an intern at the Engineering DepartmentWorking at P&IDDifferent making process of paints.