Project Internee
Packages Convertors Limited
Oct 2020 - Nov 2020 | Lahore, Pakistan

Involved with maintenance team during installation of paper cup machine which produced paper cup of 60ml (walls and omore).
Monitored the complete process of printing on rotogravure machine.
Completed project on KBA offset printing machine which doing printing on different grammage of board and involved with maintenance team during overhauling of machine.
Monitored the complete working of cutting creezing machine.
Monitored the working of folding gluing machine.

公司标识
Summer Internship
Pak Elektron Limited (PEL) Lahore
Jul 2019 - Aug 2019 | Lahore, Pakistan

Monitored the complete process as well as assembly of single phase meter.
Completed the project on ultrasonic welding machine as well as other different tasks like preparation of die and mold which are done by machining center and related to its maintenance.

公司标识
Internship
Bulleh Shah Packaging
Jun 2018 - Jul 2018 | Kasur, Pakistan

Monitered the complete working cycle of biomass 150 TPH which consists of different process like fuel, ash, water and air
Monitered the complete working of 200 TPH and 65 TPH boiler.
Detailed study of different parts of 41 MW steam turbine, bearings, mechanical seal and valves, belt drives.
I involved in on-site preventive maintenance activities like feed water pump, furnace, water injection water pump and cooling tower.
I also studied the functionality of vibrating grate which is the project assigned to me.

学历

University of Engineering & Technology
学士, 技术学士, Mechanical Engineering‎
Thermodynamics, Fluid Mechanics, Manufacturing
CGPA 3.63/4
2020

技能

初学者 Ansys
初学者 Instruments Drawing
初学者 Machine Design
初学者 Ms word, Ms Excel, power point

语言

熟练 乌尔都语
熟练 英语