概要

Seeking a challenging position in a Dynamic and rapidly growing organization. Competent and Authorized Person of Medical Gas. JCIA inspection experienced.Responsible for safe & efficient operational and preventative maintenance of MGPS and general facility maintenance activities in accordance with the regulatory requirements and guidelines provided in HTM 02.01.


项目

Sidra Medicine

工作经历

公司标识
Assistant Manager Medical Gas
OCS Facility Management services
Feb 2019 - 代表 | Dubai, United Arab Emirates



       Maintain records of calibration of test equipment. 
          JCIA Inspection representative from the health care.
•        Quarterly testing of the medical air system. 
•        Respond and support in a timely manner, plan and/or emergency work.
•        Ensuring that the MGPS is operated safely and efficiently in accordance with the statutory requirements and guidelines.  
•        Responsible for the Permit to Work System, including the issue of Permits-toWork to Competent Persons (MGPS) for all servicing, repair, alteration and extension work carried out on the existing MGPS.  and supervise the daily activities of the MGPS technical team.
Oversees and carries out maintenance and repair of MGPS equipment.
Ensures that Planned Preventative Maintenance tasks are carried out in accordance with the schedule, frequency and task lists and provides reports on any works required thereafter.
Responsible for inspections and tests of medical gas outlets/inlets, zone valves, alarms and sources in the hospital.
Ensure that the MGPS maintenance specification and schedule of equipment (including all plant, manifolds, pipe work, valves, terminal units and alarm systems) are kept up to date.
Ensures that both the quality & quantity of the jobs are in line with KPIs. 

公司标识
Medical Gas Team Supervisor
NMC Royal Hospital Abu Dhabi
Mar 2016 - Jan 2019 | Abu Dhabi, United Arab Emirates

JCIA Inspection representative from the health care.
AGS System Follow-up PPM and corrective maintenance.
Bed head out lets System Follow-up PPM and corrective maintenance.
Pendent System maintenance and Follow-up PPM.
Changing automatic manifolds cylinders and Follow-up the all cylinders in the hospital.
Daily Base Operation and Maintenance of Medical gas system.
Daily checking automatic gases manifolds.
Daily checking Medical & Surgical Air Compressors.
Daily checking Anesthetic Gas Scavenging System (AGSS pumps).
Daily checking Vacuum pumps.
Daily checking and recorded inspection the Emergency, O.T, ICU, Ambulance and Wards.
Follow-up the MGPS Empty and full Cylinders with refilling company.
Monthly and weekly meeting attending with our engineers. 
All Area Alarm Penal checking, Inspection and PPM.
Follow-up installation and PPM of the MGPS and Medical Furniture works.
Routine inspection and PPM of the Wheelchair.
Routine inspection and PPM of the Crash Cart.
Routine inspection and PPM of the Examination Couch Table.
Routine inspection and PPM of the Cardiac table.
Routine inspection and PPM of the Patient Stretcher.
Routine inspection and PPM of the Instrument Trolley.
Following all corrective maintenance work of the MGPS and all Medical Furniture.
Follow-up the Nurse Call System and corrective maintenance work.
Updated and completed all Documentation of the MGPS and Medical Furniture.
AVSU, s valves System Maintenance, testing, operations and 
Follow-up PPM and corrective maintenance.

公司标识
Medical Gas Team Supervisor
ARAS Medical Equipment & Devices
Feb 2012 - Feb 2016 | Abu Dhabi, United Arab Emirates

All type of Compressors maintenance and PPM follow u
Follow-up PPM is going on Schedule for key Projects
JCIA Inspection representative from the health care.
Gases Manifolds System maintenance and PPM follow up
All type of Medical gas work follows up with Engineer
AVSU, s valves System Maintenance, testing, Commission, Operations and 
Follow-up PPM and corrective maintenance.
AGS System Follow-up PPM and corrective maintenance
Bed head out lets System Follow-up PPM and corrective maintenance
Pendent System maintenance and Follow-up PPM
Attending PPM with our Engineer.
Medical gas cylinders change in all departments of the hospital
Following automatic manifolds bank cylinders.
Daily Base Operation and Maintenance of Medical gas system
Following corrective maintenance work.
Daily checked automatic gases manifolds.
Daily checked Medical Air Compressors.
Daily checked Surgical Air Compressors.
Daily checked Anesthetic Gas Scavenging System (AGSS).
Daily checked Vacuum pumps
Daily recorded daily reading and inspection.
Daily checked and recorded inspection the Emergency, O.T, ICU, Ambulance and Wards.
Daily update and recorded daily logbook.
Monthly and weekly meeting attending in our and SEHA engineers. 
Oxygen liquid tank daily checked and Inspection.
All Area Alarm Penal checked, Inspection and PPM.
Anesthetic Gas Scavenging System Inspection and PPM.
COMPRESSERS maintenance and follow-up PPM as per approve schedule

公司标识
Medical Gas Team leader
Sidra Medical and Research centre
Mar 2011 - Jan 2012 | Doha, Qatar

Update all in progress projects documentation which provide to higher management of company 
Attend meeting with our engineers
Prepare monthly report for work progress and submit to engineers
Follow-up work order receiving for installations works.
Workshop drawing for installation work submitting for approval and follow-up
Follow-up maintenance & installation of company key projects
Purchase of all spare parts for ongoing projects 
All type of Medical Gases work follows up 
Compressors System Maintenance, testing, commission, operations and Follow-up 

公司标识
Medical Gas
Faber LLC.
May 2008 - Feb 2011 | Abu Dhabi, United Arab Emirates

Attending PPM with our Engineer
Medical gas cylinders change in all departments of the hospital
Following automatic manifolds bank cylinders
Daily Base Operation and Maintenance of Medical gas system
Following corrective maintenance work
Follow-up Medical gas maintenance & installation of company key projects
All type of Compressors maintenance and PPM follow up
Follow-up PPM is going on Schedule for key projects 
Gases Manifolds System maintenance and PPM follow up
All type of Medical gas work follows up with engineer
AVSU, s valves System Maintenance, testing, commission, operations and Follow-up PPM and corrective maintenance
Anesthetic gas scavenging system (AGSS) Follow-up PPM and corrective maintenance
Bed head out lets System Follow-up PPM and corrective maintenance
pendent System maintenance and Follow-up PPM
Prepare monthly report for work progress and submit to engineers
COMPRESSERS maintenance and follow-up PPM as per approve schedule 
AVSU, s Valves System maintenance and follow-up PPM as per approve schedule
Bed head out lets System maintenance and follow PPM as per approve schedule
Gas Manifolds system maintenance and follow-up PPM as per approve schedule

学历

Engage in learning
证书, ‎
Infection Control
Completed
2019
OCS Group UK
证书, ‎
Completed
2019
Engage in learning
证书, ‎
Health & Safety In The Office
Incomplete
2019
Engage in learning
证书, ‎
First AId
Incomplete
2019
Engage in learning
证书, ‎
Electrical Safety
Completed
2019
Engage in learning
证书, ‎
Completed
2019
Engage in learning
证书, ‎
Completed
2019
OCS Group UK
证书, ‎
Fire Safety
Completed
2019
OCS Group UK
证书, ‎
Completed
2019
OCS Academy UK
证书, ‎
Completed
2019
OCS Group UK
证书, ‎
Time Management
Completed
2019
Govt. Polytechnic institute, Bannu
大专, ‎
Mechanical Engineering
Completed
2006
Government high school No 2 Bannu
大学入学/0级, , ‎
Computer Science
2003

技能

中级 CAFM
中级 FSI
熟练 Lab Knowldge
熟练 Medical Entry
中级 Microsoft Applications Experience
熟练 Presentable Skills
中级 Social Studies Subject Command

语言

熟练 乌尔都语
熟练 普什图语
熟练 英语