• Exposed in operations.
• Installation of Drainage, PWS, NPWS, Fire Fighting and irrigation piping system.
• Update all activities on sites.
• Produce progress reports.
• Check all drawings as per specifications.
• Make as built drawings.
• Prepared technical query.
• Prepared detail reports.
• Calculate quantity for material.
• Piping designing on Auto CAD.
• Mechanical designing on Auto CAD.

项目

MOI KAP-4

工作经历

公司标识
Mechanical & Plumbing Foreman
Al Rashid Trading & contracting Company Limited
Aug 2015 - Oct 2017 | Riyadh, Saudi Arabia

Responsibilities:
 I am working as Foreman Mechanical & Plumbing at this organization, manage all maintenance & Construction work properly as per drawings, I have much knowledge of Sewer drainage system work (Manholes, Inspection Chambers, Gully Traps, sedimentation chambers and Slow down Chambers), Water supply system, fire fighting system (Valves chambers, pipe material, fittings) and Irrigation water line.

 I have also knowledge of Chiller ducts, Sewer Drainage system, Waste Drainage System, firefighting and Irrigation pipe line fitting and these maintenance & working.

 Installation Oil Interceptors & Grease Interceptors, STP (Sewer Treatment Plant) pumping & piping, Main Fire pipeline, Fire Hydrants,

 Installation of Irrigation main pipeline, latter pipeline, Bubblers, Sprinklers, Rotator etc.

公司标识
Mechanical Engineer
Kamalia Sugar Mills Limited Kamalia
Oct 2013 - Jul 2015 | Kamalia, Pakistan

Responsibilities:
 I worked as Shift Engineer Mechanical (Maintenance Engineer) at this organization manage all maintenance & operational work properly, I have much knowledge of operation and maintenance of 14000 TCD (Ton Crushing per Day) in sugar plant equipped with water tube steam Boilers (03 Nos. of Boilers are 80 Ton/Hour & 02 Nos. are 40 Ton/Hour) steam distribution, pressure reducing and de-superheating equipments.

 Also installation, maintenance and operational work of Power house multistage back pressure steam turbine 12 MW. Commissioning, maintenance of rotating and stationary equipments like pumps, drag and roller type chain, carriers, Draught fans, gear boxes, valves, heat exchangers, vapors cells, evaporators, pre-heaters and vessels, storage tanks, batch type refine centrifugal machines, continuous centrifugal machine FCB K-1100, Multi Jet condensers, cooling tower cells, pipe fitting work etc.

公司标识
Apprantice Engineer
Kamalia Sugar Mills Limited Kamalia
Feb 2011 - Sep 2013 | Kamalia, Pakistan

 During the Training, I have attended all kinds of Gears, Valves, Pumps, Chains, Conveyors, Hydraulic units, Drawings, Operation and maintenance of 14000 TCD sugar plant equipped with water tube steam boiler (03 Nos. of Boilers are 80 Ton/Hour & 02 Nos. are 40 Ton/Hour) steam distribution, pressure reducing and de-superheating equipment & power house steam turbines 12 MW, Rotating and stationary equipments and accessories.

学历

Board Of Examination Engineer\'s
证书, Boiler Engineering‎
Boiler
Completed
2014
Govt. College of Technology Samanabad Faisalabad
大专, Diploma of Associate Engineering‎
Mechanical Design
Completed
2011

技能

熟练 Handling Assignments
熟练 Instruments Drawing

语言

中级 阿拉伯语
中级 英语
熟练 乌尔都语

关注的公司