概要

 AS an Assistant electrical engineer, I have to perform following activities.


 Implementation & tracking of Condition Monitoring for Plant Electrical Systems (Thermographical Temperature Monitoring Tests & Reporting for Generators, 500kV Switchyard Equipment, HV Transformers, Isolated Phase Bus Ducts, HV/MV Bushings, Dissolved Gas Analysis for HV Transformers).


 Execution of PM, CM & PdM tasks and recommendation of improvements for all Maintenance Procedures according to site situational conditions.


Expert in Maintenance Department for CMMS (Maximo) execution, Tracking, and preparation of Reports for maintenance performed on all Electrical equipment.


 Coordination with team members to develop risk control processes and maintain expertise in electrical equipment maintenance & troubleshooting.


 Preventive and corrective maintenance of minimax firefighting system.

工作经历

公司标识
Assistant electrical engineer
Sepco3
Nov 2018 - 代表 | Jhang, Pakistan


学历

Imperial University Lahore
学士, 理工学士, ‎
Electrical Power
CGPA 3.5/4
2017
Fazaia Model Inter College Mushaf Sargodha
中级/A级, , ‎
Pre-Engineering
2013
Fazaia Model Inter College Mushaf Sargodha
大学入学/0级, , ‎
Biological Sciences
2011

技能

熟练 Electrical Maintenance
初学者 Energy Costs
熟练 Generator Maintenance
熟练 Hands on experience of electrical system
熟练 Motor Drives

语言

中级 英语