Pakistan Engineering Council certified Electrical Engineer with over 9 years of experience in external electrification, designing and planning of electrical distribution system of Underground/Overhead of HT & LT systems of 11KV/415V/220V and 132KV grid station. Experience executing high voltage, medium voltage, low voltage and extra low voltage systems installation, inspection, supervision, operation, testing, and commissioning of all work related to electrical systems on metro rail project. My expertise also includes designing and executing cable containment, cable laying, lighting, small power, fire alarm system, FM200 fire suppression system, aspiration detection system, BACS system, lightning Protection System, earthing System, distribution boards, Sub-Main distribution boards, main distribution boards, motor control centers, HT & LT switch Gear and lighting fixtures according to BS, IEC, QCS, KAHRAMAA & NFPA72 specifications
Project Zarkon Heights
Daily site inspection of on-going work and make progress report
Calculation of material for site activities
Ensure that the works are being carried out in accordance with contract requirements, drawings, method statement and ITP's.
Preparing material demand
Preparing work schedules for contractor to meet the deadlines of the project
Checking the RFIs (Request for Inspection) against the work execution by the contractor
Carry out quality control through inspections and snagging
Designing, inspection, supervision, quality control, testing and commissioning of all the electrical works according to client specifications, BS and IEC standards
Attend meetings with the client and contractors to clarify all the queries related to the project
Project: Qatar Rail Metro Phase-1 Station Area Works (SAW) Landscaping Project
Daily Site Inspection of on-going work and make Progress Report Calculation of material for site activities Ensure that the works are being carried out in accordance with contract requirements, drawings, method statement and ITP\'s. Management of the site activities to ensure that the team carries out the works in time with the delivery schedule. Installation of UPVC ducting for light poles and bollard lights Power cable trench for feeder to pole and external lighting pole Inspection, operation, testing & commissioning of light poles, bollard lights, highway street lights, feeder pillar and submersible pumps
Project: Qatar Rail Metro Green Line Underground Project
Daily Site Inspection of on-going work and make Progress Report Material Calculation for site activities Ensure that the works are being carried out in accordance with contract requirements, drawings, method statement and ITP\'s. Management of the site activities to ensure that the team carries out the works in time with the delivery schedule. Assist with the preparation of reports and front-end studies including capital cost estimates, project schedules, material take offs and out to tender schedules. Assist with the preparation of technical and contract documentation for issue and analyzing returned tenders. Prepare & keep up to date the delivery schedule to control deliveries. Seek to clarify queries with the Design team through the request for information (RFI) system. Prepare programs using MS project. Monitor progress against the program and issue progress reports. Produce look ahead programs to assist production. Prepare method statements and risk assessments (with construction team) for production activities. Maintain a register of contract variations. Prepare test packs for recording the completion of systems. Carry out Quality Control through inspections and snagging. Carry out document control, recording & transmitting information Assisting projects with financial control of contracts during construction stage. Liaise and co-ordinate with clients other members of the design team and contractors on technical and commercial issues. Implementation of and adherence of the team to the QA/QC and HSE policies and procedure. Lead the construction team to work with all subcontractors to deliver the highest standard of product. Drives, delivery and owns construction for the assigned station, supports the SCM with defining scope/ construction interfaces and construction methods for all section works preparing necessary schedules and budgets and procuring plant, labor, materials and services as required
• Daily Site Inspection of ongoing work and make Progress Report
• Load Assessments and Calculations for buildings
• Preparing Single Line Diagram
• Attend meetings regarding Electrical System.
Preparing Shop Drawings
• Checking bill of quantities
• Checking Interim Payment Certificate.
• Installation Testing & Commissioning of Extra Low Voltage System, Lightning Protection System, Earthing System, Distribution Boards,HT & LT Switch Gear, Lighting Fixtures
External Electrification, Designing, Planning of Electrical Distribution System Underground/Overhead systems
• Load Assessments and Calculations for buildings
• Voltage drop analysis and power loss analysis by ELR (Electricity Loss Reduction) Software (i.e HT Feeder Analysis)
• Preparing Single Line Diagram of HT line or feeder
• Preparing the onsite HT feeder layouts
• Preparing bill of quantities for cost estimation of material
• Preparing Layouts of sites for supply of permanent connection to the buildings
• Preparing HT and LT technical drawings
•HT & LT Cable Underground and Overhead designing of buildings and housing societies
•Designing of Street Light System