概要

To secure a position in Electrical Engineering with considerable advancement opportunities. I am seeking a position that will utilize my skills and offer the chance of advancement as well as allow the opportunity to gain additional skills and experience.

项目

Dr. Altamash Dental Institute Clifton, Karachi

工作经历

公司标识
Electrical Site Engineer
Arcika Traders & Contractor Karachi, Pakistan
Nov 2015 - 代表 | Karachi, Pakistan

Job Responsibilties
Knowledge of SLD & BOQ
Overseeing the installation of electrical systems in buildings
Understand design specifications and technical drawings
Provide input to the daily/ weekly or monthly progress report as directed by the Project Manager.
Participate in progress, technical and coordination meetings
Preparing single line diagrams, schematics, wiring diagrams, cable schedules & layouts
Coordinate design, working drawings and specifications with the project team
Estimation, material inspection & certification/ verification of Bills
Maintained & follow HSE Policy on site as per the HSE recommendations
Submitting Catalogues and samples to consultant for getting approval
Supervise building electrical systems such as power distribution, power substation, lighting,
Transformers HV/LV, switch gear & life safety systems
Cable routing, Cable tray, Bus bars & installation of Sign lights, UPS & Emergency System

To provide inspection report and as-built drawing as per site completion condition
Installation, Testing & Commissioning of PFI panel, ATS panel, Earthing & Lightning Protection
System
Installation of Air Conditioning System & Load Calculations.
Installation & Supervision of all Extra Low Voltage (ELV) System such as FA System, CCTV System,
SMATV/MATV System, PA System & Voice/Data (Telecom) System Etc.

公司标识
Electrical Engineer
Rohri (Zeal Pak) Cement Factory Pvt. Limited Rohri, Pakistan
Jan 2014 - Sep 2015 | Rohri, Pakistan

Job Responsibilities:
Study of Electrical Single Line Diagram.
66 KV Power Grid Station and 3.3KV/440 Volts Sub Stations.
Power Transformers & Distribution Transformers.
Monitoring of all 66 K.V Oil Insulated Switch gear.
LV/MV Switchgears.
Capacitor Bank (PFI Plant).
Earthing/Grounding of Electrical Equipments.
Single & Three Phase Induction Motors.
MCCB and Motors MCC Panels.
Monitoring the Motors RPM, Vibration and Temperature.
Lead Construction Site Team for Execution and Supervision of proposed 132 KV Power Grid Stations.
Supervise the Site activities and Construction work of 132 KV Power Grid Station, Power Sub-station Buildings, and Foundations for Switchgear.
Installation of Medium Voltage and Low Voltage cable Trenches.

学历

Quaid-e-Awam University of Engineering, Science & Technology
学士, 理工学士, Electrical Engineering‎
Electrical Engineering
CGPA 2.7/4
2012

技能

初学者 2D Drwaing
初学者 Adobe Flash
中级 Adobe in Illustrator
熟练 Handling Assignments

语言

熟练 信德语
初学者 阿拉伯语
熟练 乌尔都语
熟练 英语