概要

Dear Sir-
I worked as Site Electrical Engineer in AL OTHMAN CONSULTANT Eastern Region KSA from June-2015 to May 2018. My salient responsibilities, adherent to this position, are mentioned in my resume for your reference purpose.
Previously, I had been working with K-ELECTRIC Company Pakistan, NETRACON Technologies and Maple Leaf Cement Factory Pvt Ltd, since more than 8 years at various capacities, on several 132 KV and 500 KV Substation Projects in Pakistan. I offer a good blend of experience, skills and expertise in the aforementioned Power sectors nationally amp internationally.
My consistent academic and professional achievements prove my determination and demonstrate my firm commitment to work hard for the accomplishment of my objectives.
I am confident and a self-motivated person possessing excellent leadership and team management skills. I enjoy working in teams and have effective interpersonal, analytical and presentation skills. On the basis of my qualification, experience and skills, I consider myself as a potential member of your esteemed organization.


Yours sincerely

Shams UlNabi

项目

Reinforcement of 115/13.6 KV Masoodi Substation Al hassa KSA

工作经历

公司标识
Site Electrical Engineer
Al Othman Consultants Al Khobar KSA
Jun 2015 - May 2018 | Khobar, Saudi Arabia

Job Description:
 Working with Saudi Electricity Company (SEC) Al Hassa (Eastern Region) KSA on Different projects.
Substation Projects:
 Witnessed the Reinforcement of existing Al Masoudi 115 KV/13.8 KV substation installed major equipment.
 Installation of 50/67 MVA, ONAN/ONAF Transformer 115/13.8 KV oil immersed transformer with -20% to +12.5 % OLTC,HV out door bushing and LV cable boxes,108 KV Surge arrester complete with bushing CTs, outdoor metal oxide surge arrester. 795 Kcmil ACSR/AW conductor along necessary hardware of the connection between existing SF6 bushings, installation of 3600 A breaker for incoming circuit from power transformer with three single phase PTs.
 Installation of one 3600 A breaker for bus tie circuit. Installation of 16 Nos 630A Breaker for outgoing feeder circuit bushing side, Bus-2 side 3 feeder, Bus-3 side 10 feeders.
 Installation of one 1250A Breaker for capacitor bank feeder.
 Prioritisation of designated project in accordance with available resources
 Review and approval of project estimates to achieve given scope of work
 Prepare daily, weekly and monthly reports of the project.
 Direct line responsibility to the Engineering Manager during engineering design and procurement period of the projects and functional responsibility to the Engineering Manager during the implementation of the projects.
 Keep a strict eye on Procurement and Construction progress of the project.
 Liaise with supervision, inspector, surveying, planning, QC and safety teams and provide them information .as required.
 Check the work standard at the site and ensures that work done is according to the drawing and specification.
 Help to create a culture of best practice regarding safety, housekeeping, workmanship and waste management adopt and enforce a don’t walk policy so all safety and quality issues are dealt with immediately.

Project Name : Power Factor Correction Phase-II Project
Contractor : Alfanar

公司标识
Assistant Manager Electrical
K-Electric Limited
May 2013 - May 2015 | Karachi, Pakistan

 Responsible for managing overall project activities along with project site planning, organize, coordinate the execution of technical, fiscal and administrative functions for assigned project elements, determine the sequence of activity and Lead site engineering staff and relevant parties to ensure project completion within the allocated time and budget.
 Responsible for installation and commissioning of Auto /power transformer,HT/LT switchgear, Protection relays, Current transformers(CT),Potential Transformer(PT),Substation incoming and outgoing feeder metering, voltage stabilizer, synchronizer and automation system, Firefighting system, Overhead and underground line construction.
 Fully involved in Preparation of Electrical pre-commissioning-packages for pre- commissioning tests of switchgears and Scheme such as Short Circuit & open circuit test, Turn ratio test (TTR), winding resistance test, Capacitance & dissipation factor Test (C & DF), Saturation Test (magnetization Curve), Polarity test, Ratio test, Insulation resistance test, Contact resistance test, functional Tests of scheme and troubling shooting etc.
 Responsible for Preparation of project completion schedules and EPC sheets for the assigned projects.
 Daily/Weekly site visits to check the progress of work and also supervise the installation & erection work of electrical equipment.
 Correspondence with consultant (NESPAK) and Client NTDC (WAPDA) on the issues of the projects.
 Coordination between consultants (NESPAK), Client (NTDC) and sub contractor’s engineering disciplines during all stages of design review for the assigned project.
 Monitor field work, including contract work, to ensure compliance with company standards, procedures, Contract Specifications and codes (IEC, IEEE, ASTM, ANSI etc.)
Correspondence with the Manufacturer/Vendor of the Equipment for supporting documents (type test reports, reference list, sales record etc.)

公司标识
Electrical Engineer
Netracon Technologies
Feb 2011 - Apr 2013 | Lahore, Pakistan

 Fully involved in Erection & Installation of all Electrical Equipment such as, Auto Transformer Banks, Power Transformers, Circuit Breakers (C.B), Current Transformers (C.T), Potential Transformers (P.T), Coupling Capacitor Voltage Transformers (CCVTs), Disconnector with or without Earthing switches, Lightning Arresters (L.A), Station Batteries, Battery Chargers, protection panels, control panels, Outdoor Cubical, AC/DC Auxiliary Supply panels, 11kv Switchgears, Pad mounted Transformers, Gantries & Steel Supporting Structures.
 Responsible for cable laying and their termination at their required equipment/panels as per given Cabling Schedule and Schematic diagrams.
 Fully involved in Preparation of Electrical pre-commissioning-packages for pre-commissioning tests of switchgears and Scheme such as Short Circuit & open circuit test, Turn ratio test , winding resistance test, Capacitance & dissipation factor Test (C&DF), Saturation Test (magnetization Curve), Polarity test, Ratio test, Insulation resistance test, Contact resistance test, functional Tests of scheme and troubling shooting etc.
 Preparation of B.O.Q & cost estimation for variation orders/modifications etc. and also estimating engineering manpower requirements
1-132kV GIS Hybrid Grid Station Gulistan-e-Johar (Hospital) Karachi
2-132/11.5kV Grid Station Plandri (Conversion from 33kV to 132kV) Lot-III

公司标识
Assistant Manager Electrical
Kohinoor Maple Leaf Group ( Cement factory)
Aug 2007 - Jan 2011 | Daud Khel, Pakistan

 Operation and maintenance of 132/11 KV substation.
 Troubleshooting of 20/26 MVA Power Transformers, 132KV Circuit Breakers and Disconnector switches.
 Testing of 20/26 MVA Power transformers and 132KV Circuit Breakers.
 Performed De-Hydration process of transformers oil along with oil testing to confirm the dielectric strength of the oil according to IEC standards.
 Responsible for the preparation of six monthly maintenance schedules.
 Responsible for Power Distribution throughout the plant.
 Plant Lighting maintenance and installation.
 Modification and installation of new switchgears, if required at Grid station.
 Dealing with WAPDA regarding load management and energy bill.
 LV power distribution.
 Energy audit with internal auditors and external auditors.
 Operation and maintenance of 1000 KVA Siemens Diesel generator (Cummins engine) with 1500 RPM and Dc excitation system.
 Electrical workshop in charge.

公司标识
Internee
WAPDA GENCO-II
Jul 2006 - Jul 2007 | Guddu, Pakistan

 Operation of 600 MW Combined Cycle power plants.
 Comprises of 04 Gas Turbines (100 MW) each of frame 9E & two Steam Turbines (100MW) each Mark-VI e Control System.
 Maintenance of Generators, 122MVA, 100 MW each, 06 Units and protections.
 Transformer Routine Checks (Oil Level, Temp: Surge Arrestor)
 Switching of HV/MV/LV Breakers
 Hi – Pot test of transformer & Cables.
 Dehydration of transformer.
 Fault Detection experience of control Cables.
 Monitoring of running plant and logging parameters.
 Regular and detailed inspection of automation room and switchgear.
 Regular and detailed inspection of rotating equipment and stationary equipment.

学历

Quaid-e-Awam University of Engineering, Science & Technology
学士, , B.E Electrical‎
2006

技能

熟练 Electric Power Management
熟练 Fitness Consultation
熟练 Handling Assignments
熟练 workbench

语言

中级 旁遮普语
熟练 信德语
中级 印度语
熟练 乌尔都语
中级 阿拉伯语
中级 英语

关注的公司