概要

Planning, Scheduling, Implementation and Supervision of Preventive and Predictive Maintenance for rotary and stationary equipments of Draw line, HVAC and utilities department, Main Sections Include:

Chillers: Centrifugal Type, Make: Trane, USA and Absorption Type Make: Broad, China & Shuang Liang , China

Compressors: Screw Type, Oil Free, Make: Atlas Copco Belgium and BOGE Germany

Compressor, Reciprocating type , Gong Tong , China

Water Treatment Plants: Reverse Osmosis Units, Make: Enviro Chemie, GmbH.

Cooling Towers: Induced Draft, Make: Linear, Malaysia and Liang Chi , Thailand

HVAC unit, make Luwa, Germany

Heavy duty gear boxes, Make, Trutzschler Germany

Boilers, Fire tube boilers 10 Ton, 14 Ton Standard Kessel Germany, Water tube boilers Andritz, Austria, water tube boilers Descon, Coal chain grate boiler etc

Major Projects

1. Shut down of Polyester Plant in 2008, 2011 and 2014

2. Ibrahim fibres Limited expansion Project 600TPD in 2011-2013

3. Erection of 21.5MW Coal fired Power plant in 2016-2017

4. Shut down of coal fired Power plant 21.5MW in 2020

Skills include

1. Oracle

2. Ms project

3 Ms office

4. Ms outlook

5. SAP

项目

Furnace Rebuild, TW(F1) (March 2023 to Date)
Furnace Rebuild, F-3 (December 2021 to February 2022)
Erection and Commissioning of Oxygen Plant (VPSA 270), Capacity, 270 NM3/hr
Erection Of 21.5MW Coal Fired Power Plant Of Ibrahim Fibres Limited
Ibrahim Fibres Limited Expansion Project Of Polyester Plant 600 TPD
Shut Down Of Coal Fired Power Plant 21.MW

工作经历

公司标识
Deputy Manager Maintenance, Utility
Tariq Glass Industries Limited
Apr 2021 - 代表 | Sheikhupura, Pakistan

Tariq glass industries Pvt. Ltd is one of the best Glass Manufacturer in Pakistan having 02 Table Ware and 02 Float Glass Tons with Total 04 Furnaces of Capacities (2x550 Ton) & (2x180 Ton). It is located in Sheikhupura.
Designation: Dy. Manager Mechanical Maintenance Date of Joining: April, 2021 to Date
 
Job Responsibilities:
 
¨       Maintenance of multiple glass forming lines that includes annealing lehrs, conveyors, centrifugal fans, Gear Boxes, Hydraulic System etc.
¨       Operation maintenance and troubleshooting of screw air compressors, like DEMAG (5x160 KW) WUXI (2x160 KW), Atlas Copco (1x160 KW) and Kaser Compressor (1x75 KW) and (2X37 KW)
¨       Operation and Maintenance of cooling tower Induced Draft (Counter Flow)
¨       Operation and maintenance of water supply system (Raw and Soft Water) to Plant and utilities
¨       Operation and maintenance of Raw Water Softening plant and RO Plant.
¨       Development and implementation of Preventive maintenance of all major equipment like, Fans, Pumps, Lehrs, Gear boxes
¨       Planning and execution of shut down jobs. Planning and execution of Projects, modification and development.


¨       Preparation of project proposals, Material and equipment specifications.
¨       Managing inventory and its usage control, Setting min and max in SAP
¨       Implementation of daily condition monitoring of all major equipment , taking actions against the reports on daily basis
¨      Training of staff regarding the condition monitoring.

公司标识
Senior Engineer Mechanical
Sitara Chemical Industries Limited
Mar 2020 - 代表 | Faisalabad, Pakistan

Responsible for smooth operation of Plant Chlore alkali, CaCl2 94 prills plant, CO2 production plant, inventory stock level control using SAP system

公司标识
Assistant Manager (BSC Mechanical Engineer)
Ibrahim Fibres Limited Polyester Plant
Jul 2007 - Mar 2020 | Faisalabad, Pakistan

Working experience in Ibrahim fibres Limited Polyester Plant is 13 years

学历

University of Engineering & Technology
学士, 理工学士, BSc Mechanical Engineer‎
Thermodynamics
所占比重 80%
2006

技能

熟练 Accoount Management
初学者 AutoCad
中级 Delievry Planning
中级 Mechanical Drawings
熟练 Mechanical Inspection
熟练 Mechanical Maintenance
熟练 Mechanical Repairing
熟练 Microsoft Excel
熟练 Microsoft Outlook
熟练 Microsoft Powrpoint
中级 Microsoft Project
熟练 Oracle

语言

熟练 英语
熟练 乌尔都语