概要

I have worked as Assistant Sales Manager, Project Engineer, Sales Engineer in the field of Engineering Sales, Business Development, & Production Coordination to control production, Procurement installation/maintenance of Air Compressor, LPG Bottling Plant, Syntactic Natural Gas, LPG Auto Filling Station, LPG Cylinder, LPG Bowzers, LPG & Liquid Storage Tanks, Blenders, Vaporizers, Generators, Pumps & Valves. I also had worked on Project Planning and Control, Piping Installation, Procurement two of 8MGD Water Treatment Plants and also work on water treatment plants bidding. I had worked on AutoCAD 2D & 3D in automotive parts instruments manufacturing industry and having overall experience of 06 year.
I am member of strong industrial mechanical team & performed as a middle management team player.
Objective: Seeks a challenging role whereby I could utilize my full potential carrying out duties and responsibilities & to become a part of vibrant Technical/Engineering concern.

项目

Jadeed Feed
Daewoo Battery - First Treet Manufacturing Modaraba Faisalabad
Rafhan Maize Products Co. Ltd. Faisalabad
Packages Mall, Lahore SNG Unit
Nishat Emporium SNG Project
8MGD Water Treatment Plant Halanaka, Hyderabad, Sindh, Pakistan
8MGD Water Treatment Plant Preetabad, Hyderabad, Sindh, Pakistan
Designing & development of Suzuki Aulto Car and Fiat Tractor Fuse Box

工作经历

公司标识
Assistant Sales Manager
Ameejee Valleelee & Sons Pvt Ltd
Mar 2016 - 代表 | Lahore, Pakistan

• To achieving sales targets and growth by successfully managing the sales team.
• Designing and implementing a strategic business plan to expand company’s customer base.
• Make ensure strong presence at end-user.
• Coaching and performance monitoring of sales representatives.
• Build and promote strong, long-lasting customer relationships by associating with customer and understanding their needs.
• Present sales, revenue and expenses reports and realistic forecasts to the management team.
• Identify emerging markets and market shifts while being fully aware of new products and competition status.
• Preparation of comparison sheets with competition showing techno-commercial benefits.
• Designing of compressor room for customer.
o First Treet Manufacture Modarba (FTMM) GA160x03, BD 1260x01.
o Nishat Unit 81. GA75+x02, Fx18x02, DD/PD 210+
o Pak-Arab Refinery GA110x03
o Remington Pharmaceutical (Pvt) Ltd ZT22x02, CD185+, DD/PD/DDp.
o US Appral Ltd GA132x01, GA75x03, FX, DD/PD
o SM Denim ZH900, FD1250.
• Provide consultancy over compressed air piping network at plant and calculating pressure drop.
• Preparation of margin sheets on annual basis.
• Supervise the turnkey projects of compressor room including installation of compressor, dryers, filters, piping work, exhaust ducts, compressor room construction & deign.
• Preparation of P&ID for compressed piping network.
• Preparation of project schedule by using MS Project.
• Competitor product analysis for internal trainings and customer orientations (prepare presentations against Keaser, Boge, ComAir, Inger Soll Rand, etc.)

公司标识
Project and Automation Engineer
HI-TEK Manufacturing Pvt Ltd, Lahore
Feb 2014 - Feb 2016 | Lahore, Pakistan

• Preparation of proposal for SNG System, Bottling Plants, LPG Filling Stations, LPG & Ammonia Tanks.
• Preparation of Contract for different projects, SNG System, Bowzers and Tanks.
• Coordinating with our Manufacturing Area for manufacturing of LPG Storage Tanks and Surge Tanks, LPG Bowzers & Bobtails.
• Coordinating with Client for Team Mobilization and other Site related activities.
• Leading Team Mobilization at Site and placement of tanks and other equipment.
• Calculation of Piping, valves, & accessories for each plant.
• Preparation of P&ID for each Plant.
• Preparation of project schedule by using MS Project.
• Developing new sources of procurement by addition of new international supplier.
• Procurement of Blackmer USA Pumps (LGL D 2, LGL 1.5), Atlus Copo Air Compressor (GA37+FF), Vaporizer 100 Kg/hr to 500 Kg/hr (Korean Gas Engineering-Korea, Ransome-USA, KAGLA-Japan), Air Mix Blender (Ransome-USA and Ather DBS-USA), Leak Detection System-GECA-Italy and Gazex-Poland, Pressure Vessel Material (SA516Gr70 & SA517GrB) from China, Actuated Valves from Italy, Rolling Machine from China, fire water pumps & etc.
• Preparation of Technical specification for procurement.
• Preparation of Technical and financial comparative statement.
• Attending technical meeting regarding LP System and Syngas System.
• Supervision of Plant Layout form LPG Auto station, LPG Bottling Plant and SNG Plant as per NEFPA-58.
• Preparation of BOQ’s for Mechanical Piping, Valves, Instrumentations of Plants.
Projects:
Nishat Emporium, Lahore
Packages Mall, Lahore
Rafhan Maize Products Co. Ltd. Faisalabad
Sangla Petro Gas Pvt Ltd, Sangla
Tetra Pack Lahore

公司标识
Sales and Service Engineer
Technology Links Private Limited
Mar 2013 - Feb 2014 | Lahore, Pakistan

• Generation of Sales Volume from Industrial and Education Sector.
• Preparation of technical and financial proposal.
• Work on installation of following principal equipment.
 Armfield – UK
 Cussons – UK
 Denford – UK
 P.A. Hilton – UK
 VB – Italy
 Feedback – Germany
 Shimadzu – Japan
• Coordination with industries and technical education sector for sales activities.
• Erection, Installation and Give Training of 3 Axis CNC Milling Machine (Denford-UK) and 2 Axis CNC Lathe Machine (Denford-UK) at NFC University Faisalabad.
• Erection, Installation and Give Training of 02 Nos 3Axies CNC Milling Machines (Denford-UK) at International Islamic University Islamabad.
• Installation of Universal Testing Machine (Shimadzu-Japan) at Technology Upgrada-tion and Skill Development Company – Pakistan (TUSDEC).

公司标识
Assistant Supervisor
Descon Engineering Limited, Lahore Pakistan
Oct 2006 - Nov 2007 | Lahore, Pakistan

Responsibilities
• Preparation of Mechanical BOQ of complete 8MGD Water Treatment Plant.
• Calculation of Piping, valves, & accessories for complete 8MGD Water Treatment Plant.
• Preparation of Technical specification for procurement.
• Preparation of Technical Comparative Statement.
• Waste and Clean Water flow level calculation.
• Planning, Scheduling, & Installation of Plant Interconnecting Piping, Pumps, Valves, Air Compressor, Instrumentation & etc.
• Capable to Lead & manages the production Team.
• Preparation of P&ID’s for water flow on complete plant and for each individual part of plant

PROJECT:
• 8MGD Water Treatment Plant Preetabad, Hyderabad, Sindh, Pakistan
• 8MGD Water Treatment Plant Halanaka, Hyderabad, Sindh, Pakistan

公司标识
Design Supervisor
PECS Industry Pvt Ltd
Jun 2006 - Oct 2006 | Lahore, Pakistan

• Designing and development of Suzuki Aulto Car Fuse Box Molding Dies.
• Designing and development of Fiat Tractor Fuse Box Molding Die.
• Designing and development of Fiat Tractor Light Switch Molding Die
• Maintenance of Molding Dies.
• Efficient use of man, machine, material & method.
• Making 3D Model for Rapid prototyping & Mold Development

学历

UET Lahore PK
学士, Bachelors in Engineering, B.Tech Hons‎
Mechanical Design
等级 A
2012
Virtual University of Pakistan. Lahore
硕士, 工商管理硕士学位, MBA Human Resource‎
Human Resource Development
CGPA 2.9/4
2012
Govt. College of Technology Lahore(Tevta)
中级/A级, 普通科学学生, D.A.E in Mechanical Technology‎
Mechanical Design
所占比重 87%
2006
Done Basco High School
大学入学/0级, 科学, ‎
Biology
等级 C+
2003

技能

熟练 Air Audit
中级 Autodesk Inventor
中级 CNC Manufacturing
中级 CNC Programming
熟练 Competitor Intelligence
熟练 Compressed Air
熟练 Compressed Air Management
熟练 COMPRESSOR
熟练 Cross Team Communication Skills
熟练 Customer Management
熟练 Engineering Sales
熟练 Fire Pumps Knowledge
中级 GAS Meter
中级 Inventory Control
熟练 Leading Development Teams
熟练 LP Air Mix Plant
熟练 LPG
中级 Managing Midsize Teams - 5 to 20 People
熟练 Mechanical Work
中级 Mould Design
中级 Pro Engineer
熟练 Process Planning
熟练 Production Quality Monitoring
中级 Project Plans Management
熟练 Pumps Knowledge
熟练 Team Motivation

语言

熟练 英语
熟练 乌尔都语