Professional, highly qualified Electrical Engineer with excellent organisational and team working skills. Ideal candidate for position requiring drive, initiative, responsibility and challenge.
A lead Electrical Engineer with over 08 years of working experience in Saudi Arabia and Pakistan.
Extensive experience in Construction, Erection, Maintenance, supervision & meeting difficult deadlines under pressure with limited resources.
Very good understanding of Quality Management System and QA/QC System from Project start to final project dossier.
Ensuring the smooth progress and completion of projects within cost, time, quality standards and project specifications.
Review documents submittals and evaluate its integrity and compliance as per project drawings and specifications.
Review and approvals of material and material inspections.
Site Supervision and Quality control of all Electrical engineering items, including stage wise inspections up to completion.
Secured work experience as a Site Engineer Electrical reporting to directly to the Senior Manager Electrical (National Grid)
Installation of new substations 115kv, 230kv, 380kv.
Modification of existing substations.
Power Factor improvement modification.
Installation of cable trays and cable ladders.
Installation of transmission lines over head head 115kv, 230kv, and 380kv.
Checking Electrical equipment/material capacity depending upon requirement.
Inspecting RFI for work done at site.
Monitoring the progress of electromechanical works.
Secured work experience as a Project engineer reporting directly to the Project Manager.
Installation of substation equipments.
Installation of Power Transformers, CTs, PTs, Bus bars, lighting/ Surge Arresters, Breakers, Isolators & Earth Connectors.
Protection Tests of CTs, PTs, Power Transformers.
Testing of Earth Resistance, Polarity & Magger.
Testing and commissioning of the electrical services.
Installation of lighting system, power system, laying & termination of power supply cables.
Electrification of the buildings.
Installation of the BMS control system.
Installation of the EIB control system.
Installation of CCTV system.
Installation of Sound & MATV system.
Installation of Anti Theft System.
Installation of Fire Alarm System.
Installation of Access Control System.
Review shop drawings for accuracy & essential work being completed to meet specification.
Checking E/M equipment/material capacity depending upon requirement.
Initiate RFI as per project requirement for all the activities.
Daily interaction with site team and procurement department for inspection of each material delivered at site with reference to approved materials.
Checking of electrical installation as per Quality Assurance & Quality Control Criteria.
Monitoring the progress of electromechanical works.
Erection of Generators of total 4.8MW,GAS TURBINE, including distribution panel, Switch Gear, whole power distribution, installation of lighting fixtures power outlets & fire alarm system.
Installation of substation equipments.
Installation of Power Transformers, CTs, PTs, Bus bars, lighting/ Surge Arresters, Breakers, Isolators & Earth Connectors.
Protection Tests of CTs, PTs, Power Transformers.
Under-ground services networking including cable laying and installation.
Testing and commissioning of the electrical services, fire fighting services and the portable water services.
Earth resistance testing.
Electrification of Site office.
Ensured health & safety procedures were adhered to and reported any breaches.
Installation of lighting fixtures, power outlets, fire alarm system, and calculation of distribution load of third floor building.
Integrated security systems, sound systems and electrification of the site offices.
Installation of cable trays, cable trenches and underground cables.
Secured work experience as a Site Inspector reporting directly to the Project Manager.
Liaised with Engineers and reported to Project Manager on all tasks.
Reported to the Senior Engineer.
Energy loss reduction (ELR).
Replacement of bare LT conductor with aerial bundled cable.
Replacement of all energy meters with static digital meter either single phase or three phases.
Installation of substation equipments.
Installation of Power Transformers, CTs, PTs, Bus bars, Surge Arresters, Breakers, Isolators & Earth Connectors
Some of the important tests conducted at site are given as under for Power Transformers, CTs & PTs.
Power Transformer Testing.
Insulation Resistance tests.
TTR test
Short Circuit Test & Open circuit Test
Zero sequence Test
C & DF (Capacitance and dissipation factor) Test
Main Buchholz relay test
Tape Changer Buchholz relay test.
Current Transformer / Potential Transformer Tests.
Polarity Test.
Ratio Test.
Continuity Test
Magger / Insulation Resistance Test.
Saturation / Excitation / Magnetization Test(CTs only)
Protection of power transformer performed
Differential protection
Over current and earth fault protection
Main Buchholz & Tape Changer Buchholz protection
Oil temperature protection