概要

Professional, highly qualified Electrical Engineer with excellent organisational and team working skills. Ideal candidate for position requiring drive, initiative, responsibility and challenge.

 A lead Electrical Engineer with over 08 years of working experience in Saudi Arabia and Pakistan.
 Extensive experience in Construction, Erection, Maintenance, supervision & meeting difficult deadlines under pressure with limited resources.
 Very good understanding of Quality Management System and QA/QC System from Project start to final project dossier.
 Ensuring the smooth progress and completion of projects within cost, time, quality standards and project specifications.
 Review documents submittals and evaluate its integrity and compliance as per project drawings and specifications.
 Review and approvals of material and material inspections.
 Site Supervision and Quality control of all Electrical engineering items, including stage wise inspections up to completion.

项目

SAOO Project

工作经历

公司标识
Site Engineer Electrical
Al Othman Consultants
Jan 2016 - 代表 | Al Ahsa, Saudi Arabia

 Secured work experience as a Site Engineer Electrical reporting to directly to the Senior Manager Electrical (National Grid)
 Installation of new substations 115kv, 230kv, 380kv.
 Modification of existing substations.
 Power Factor improvement modification.
 Installation of cable trays and cable ladders.
 Installation of transmission lines over head head 115kv, 230kv, and 380kv.
 Checking Electrical equipment/material capacity depending upon requirement.
 Inspecting RFI for work done at site.
 Monitoring the progress of electromechanical works.

公司标识
Project Engineer Electrical
Zuhair Fayez Partnership Consultant
Jul 2012 - Nov 2015 | Abha, Saudi Arabia

 Secured work experience as a Project engineer reporting directly to the Project Manager.
 Installation of substation equipments.
 Installation of Power Transformers, CTs, PTs, Bus bars, lighting/ Surge Arresters, Breakers, Isolators & Earth Connectors.
 Protection Tests of CTs, PTs, Power Transformers.
 Testing of Earth Resistance, Polarity & Magger.
 Testing and commissioning of the electrical services.
 Installation of lighting system, power system, laying & termination of power supply cables.
 Electrification of the buildings.
 Installation of the BMS control system.
 Installation of the EIB control system.
 Installation of CCTV system.
 Installation of Sound & MATV system.
 Installation of Anti Theft System.
 Installation of Fire Alarm System.
 Installation of Access Control System.
 Review shop drawings for accuracy & essential work being completed to meet specification.
 Checking E/M equipment/material capacity depending upon requirement.
 Initiate RFI as per project requirement for all the activities.
 Daily interaction with site team and procurement department for inspection of each material delivered at site with reference to approved materials.
 Checking of electrical installation as per Quality Assurance & Quality Control Criteria.
 Monitoring the progress of electromechanical works.

公司标识
Site Engineer Electrical
Techno Consult International
May 2010 - May 2012 | Karachi, Pakistan

 Erection of Generators of total 4.8MW,GAS TURBINE, including distribution panel, Switch Gear, whole power distribution, installation of lighting fixtures power outlets & fire alarm system.
 Installation of substation equipments.
 Installation of Power Transformers, CTs, PTs, Bus bars, lighting/ Surge Arresters, Breakers, Isolators & Earth Connectors.
 Protection Tests of CTs, PTs, Power Transformers.
 Under-ground services networking including cable laying and installation.
 Testing and commissioning of the electrical services, fire fighting services and the portable water services.
 Earth resistance testing.
 Electrification of Site office.
 Ensured health & safety procedures were adhered to and reported any breaches.
 Installation of lighting fixtures, power outlets, fire alarm system, and calculation of distribution load of third floor building.
 Integrated security systems, sound systems and electrification of the site offices.
 Installation of cable trays, cable trenches and underground cables.
 Secured work experience as a Site Inspector reporting directly to the Project Manager.
 Liaised with Engineers and reported to Project Manager on all tasks.

公司标识
Site Engineer Electrical
Power Engineering Services
Feb 2010 - Apr 2010 | Sukkur, Pakistan

 Reported to the Senior Engineer.
 Energy loss reduction (ELR).
 Replacement of bare LT conductor with aerial bundled cable.
 Replacement of all energy meters with static digital meter either single phase or three phases.

公司标识
Junior Engineer Electrical
Water & Power Development Authority
Jan 2009 - Feb 2010 | Hyderabad, Pakistan

 Installation of substation equipments.
 Installation of Power Transformers, CTs, PTs, Bus bars, Surge Arresters, Breakers, Isolators & Earth Connectors
Some of the important tests conducted at site are given as under for Power Transformers, CTs & PTs.

Power Transformer Testing.
 Insulation Resistance tests.
 TTR test
 Short Circuit Test & Open circuit Test
 Zero sequence Test
 C & DF (Capacitance and dissipation factor) Test
 Main Buchholz relay test
 Tape Changer Buchholz relay test.
Current Transformer / Potential Transformer Tests.
 Polarity Test.
 Ratio Test.
 Continuity Test
 Magger / Insulation Resistance Test.
 Saturation / Excitation / Magnetization Test(CTs only)
Protection of power transformer performed
 Differential protection
 Over current and earth fault protection
 Main Buchholz & Tape Changer Buchholz protection
 Oil temperature protection

学历

Quaid-e-Awam University of Engineering, Science & Technology
学士, , BE electrical engineering‎
2009

技能

熟练 Handling Assignments
熟练 Instruments Drawing

语言

熟练 英语
初学者 阿拉伯语