Duration From, March. 2016 to Date
Position Commissioning Supervisor
Gambat Gas Processing Facility -II
JOB PROFILE
Take part in Pre Commissioning , Commissioning, Master startup and Normal operation of following Units
Gas Sweetening (Amine Absorption Regeneration) Unit
Molecular sieve Gas Liquid Dehydration Units
Hydrocarbon Dew Point Control unit
Refrigeration (Propane) Unit
LPG Extraction and Condensate Stabilization Unit
Turbo Gensets with waste Heat Recovery Unit
Utility Packages including Hot Oil, Nitrogen Generation, Air Compression, RO Unit.
Compressors (Screw, Reciprocating and Centrifugal), Pumps,
Heaters, CO2 Incinerator, Tanks and LPG Bullets.
CPI Package
Punch listing with project team of Mechanical, Electrical and Instrumentation.
Prepare Loops for water flushing, Air blowing and steaming out of Process Utility Piping
Performance testing of the Pumps, Fin Fans, Compressors, Heaters, Separators, Columns.
Duration From, March. 2016 to Date
Position Commissioning Supervisor
Gambat Gas Processing Facility -II
JOB PROFILE
Take part in Pre Commissioning , Commissioning, Master startup and Normal operation of following Units
Gas Sweetening (Amine Absorption Regeneration) Unit
Molecular sieve Gas Liquid Dehydration Units
Hydrocarbon Dew Point Control unit
Refrigeration (Propane) Unit
LPG Extraction and Condensate Stabilization Unit
Turbo Gensets with waste Heat Recovery Unit
Utility Packages including Hot Oil, Nitrogen Generation, Air Compression, RO Unit.
Compressors (Screw, Reciprocating and Centrifugal), Pumps,
Heaters, CO2 Incinerator, Tanks and LPG Bullets.
CPI Package
Punch listing with project team of Mechanical, Electrical and Instrumentation.
Prepare Loops for water flushing, Air blowing and steaming out of Process Utility Piping
Performance testing of the Pumps, Fin Fans, Compressors, Heaters, Separators, Columns.
i have 6 year experince oil and gas sector pakistan petroleum ltd and byco oil pakistan ltd in operation department.............