I am a mechanical engineer with 3 years of experience in production planning and control in Omar Jibran Engineering Industries Limited.
I am passionate about production and inventory management. I have spent last one year helping enhancing production achievement targets through micro-management, minimizing rejection and rework by conduction training sessions of employees and controlling cost through some design changes in the processes. I reduced absenteeism and turn over by 7.32% and 3.57% respectively. Production target achievement reached at a maximum of 99.2%.
I am currently seeking a career in supply chain and logistics. I find this area âthe center of an organizationâ around which everything revolves and this thing has urged a desire in me to pursue my career in supply chain.
Preparation of monthly production plan for all components and its execution to meet monthly targets
To forecast monthly budget and have deep look into operational expenditure and work within the approved budgeted costs
Manage the resources (personnel & equipment) in press shop to achieve production goals and objectives
To maintain accurate stock levels for the department
Develop skills of employees for the presses and other operations to meet current & future needs
Manage presses utilization at acceptable loading capacities
Ensure the safety of plant and people
Manage accurate record of manufactured components, compilation of reports and breakdowns
Control the quality & related issues of components
Preparation of monthly production plan for all machines as per purchase order from HACPL
Execution of monthly production plans by modifying it accordingly to meet daily, weekly and monthly targets
Ensure effective implementation of SOPs, 5S and QCDMS
Preparation of planned vs actual machine loading capacities for visualization of breakdown effects on monthly production capacity
Formulation of monthly breakdowns on pareto and pie chart for RCA and application of PDCA to eliminate it
Participation in quality trainings at HACPL
Analyze raw material and process material wastages, take reduction action for material wastage
Maintain raw material and finish goods inventory to zero variance, physical vs system
Manage and control HACPL supply and outsource production
Collected rework data at the end of assembly line and proposed different techniques to minimize rework
Studied processes in production unit with respect to cost reduction
Studied process in all four departments i.e production, maintenance, quality and heat treatment