概要

Registered Engineer fro Pakistan Engineering Council
Possess excellent interpersonal, analytical and organization skill to excel within highly competitive environments where leadership skills are the key to success. Excel at interfacing with others at all levels to ensure organizational goals are attended.
1. Computational and analytical skills
2. Interpersonal and communication skills
3. Continuous learner and willingness to improve..

项目

Calibration Of Mechanical Gauge
Air Handling Unit Hilal Foods
Assembling Of Cooling Tower
Cooling tower
Air Handling Unit , Cooling Tower
Stress Analysis of ball bearing
Reserch Paper on Longitudinal Vehicle Dynamic of Automobile
ENERGY AND EXERGY ANALYSIS OF ORGANIC RANKINE CYCLE
查看更多

工作经历

公司标识
Maintenance Engineer
National Technology Inc
Mar 2018 - 代表 | Karachi, Pakistan

Erection of Air handling Unit
Erection of cooling tower
Assembling of pipes
Erection of chiller
Maintenance of HVAC Equipments
Maintenance of Boiler
Comissiong of of cooling tower
Chiller comissiong and Erection

公司标识
Maintenance and Calibration Engineer
Premier tubular Inspection
Feb 2017 - Mar 2018 | Karachi, Pakistan

Maintenance and Callibration Engineer at premier tubular inspection service , have to maintain the equipment and have to callibrate the equipment of oil and gas company

公司标识
Intern
Jamshoro Thermal power company limited
Dec 2015 - Jan 2016 | Jamshoro, Pakistan

Winter Internship for a period of three weeks. Analyzed the layout of power generation cycle incurring in 4 power units developing the net total of 800 MW electricity together with the refrigeration chillers operating on vapor absorption cycle using the steam extracted from Low stage turbine.

公司标识
Intern
Dawlance Group of Companies
Dec 2015 - Jan 2016 | Hayatabad, Pakistan

Perform engineering work related to configuring, deploying, maintaining and upgrading CAD models.
Design, develop and engineer high quality models using 3D and 2D CAD tools.
Produce designs that meet targets for feasibility, performance, costs, quality, safety, legislation and timing.
Ensure that all work carried out is in compliance with company design, safety, quality, environmental compliance and proceduralstandards

公司标识
trainee Engineer
Fimcotex Industries (Pvt.) Ltd.
Nov 2013 - Aug 2015 | Kotri, Pakistan

I was trainee there to work with machines and fabrication process

公司标识
Intern
New Dadu Sugar Mill
Dec 2014 - Jan 2015 | Dadu, Pakistan

Two Week Winter Internship
Tutorial and workshop sessions to address the design, operation and maintenance of boilers, as well as boiler theory
Operational and maintenance issues associated with extraction plant, extraction processes, terminology and measurement techniques
Work out on Efficient Use of High Pressure and Process Steam
Extraction Theory and Practice for Milling Engineers
Introduction to Extraction for Shift Supervisor
Steam Generation

学历

Mehran University of Engineering & Technology
学士, 技术学士, Bachelors of Engineering‎
Aerodynamics/CFD, Engineering Management, Manufacturing Systems
CGPA 3.1/4
2016
Govt Niaz High School
大学入学/0级, 科学, Science‎
Science
等级 A+
2010

技能

1 yearAbility to work Techanically
少于一年Ability to work under pressure.
1 yearAnsys
少于一年AutoCAD
1 yearCOMMUNICATION
少于一年elevator/escalator installation (includ
少于一年Fabrication
2 年 leader
少于一年maintenance
少于一年MATLAB
少于一年Microsoft Word
1 yearOffice / Staff administration / Supervis
少于一年Positive attitude & strong sense of resp
2 年 PRESENTATION SKILL
少于一年Pro E
少于一年Quality Assurance (QA)
1 yearResearch Ethics

语言

中级 信德语
熟练 乌尔都语
中级 英语