概要

To secure a position of electrical engineer in a firm where I can use my technical skills and experience in designing procedures for electrical controls equipment, defining set points and calibration techniques effectively for the benefit of the company.

工作经历

公司标识
Project Engineer
United Energy Pakistan Limited
Apr 2017 - 代表 | Tando Adam, Pakistan

Dismantling and installation of control instruments.
Control cable laying.
Instrument cable gland installation and cable termination.
Instruments repairing and testing.
Ensure that all necessary safety measures are taken during execution of job.
Report to the construction manager regarding any technical problems, work front issue or modifications required.
Maintain a good teamwork spirit and cordial relationship with staff.
Ensuring that the work is performed in accordance with the specifications.
Ensuring that the work is being carried out as per the project quality plan.
Maintain data sheets, P&IDs and records of instruments.

公司标识
internee
United Energy Pakistan Limited WIND
Jun 2016 - Jul 2016 | Karachi, Pakistan

公司标识
internee
K-Electric Limited
Jun 2015 - Jul 2015 | Karachi, Pakistan

公司标识
internee
fauji fertilizers bin qasim
Jun 2014 - Jul 2014 | Karachi, Pakistan

学历

Mehran University of Engineering & Technology
学士, 技术学士, electrical engineering‎
Electrical Power
CGPA 2.66/4
2016

技能

初学者 Handling Assignments

语言

中级 英语