After graduating, as a mechanical engineer, from Ghulam Ishaq Khan Institute GIKI (ranked 1st in Pakistan and 37th Globally in SDG4 Quality Education), I joined Fauji Cement Company, in 2018, as a maintenance engineer.

I performed multiple preventive and corrective maintenance jobs under the guidance of the maintenance team leader. Later, I was involved in the installation and commissioning roles in two projects
Addition of a cement bag packing and dispatch line, Make Haver Boecker. (Dispatch capacity increased by 20).
Replacement of an obsolete airlift system by efficient belt bucket elevator, Make Aumund. (Power consumption reduced from 240 to 65KW).

My passion, to work in RD and planning roles, was realized during my appointment as Assistant Manager Maintenance and Material Demand Planning in the newly formed planning department. I encountered multiple tasks of Material Planning, SAP Material Management (MM), SAP Plant Maintenance (PM), Shutdown Planning, Demand Supply Planning, CPM Scheduling, Budgeting and Forecasting, Supplier Sourcing, Supply Chain Management, Enterprise Resource Planning (ERP), Inventory Optimization/Management/Rationalization, Research and Development (RD), Project Management, and Spare Parts Management

I played a leading role, as a project engineer, in the Surface Water Supply from Natural Water Stream to Plant Reservoir Project. Its key outcomes are listed below
Cost saving of 27 million/month through this project as compared to the previous groundwater sources.
Payback period of the project is 7 months.

I am doing an Executive Master of Business Administration (EMBA), with major in Operations Supply Chain Management, from National University of Sciences and Technology (NUST H12). The main motive behind it is to gain leadership, negotiation, and decision-making skills, and to grasp some financial knowledge.

Other Skills Microsoft Excel/Word/PowerPoint/Project, Preventive Maintenance, Mechanical Engineering, Problem Solving, ANSYS Fluent, SolidWorks, C, Leadership, Decision Making, Teamwork, Negotiation, Multitasking, Handling High Volume Workloads, People Management, and Communication.

I get excited to avail opportunities where I can utilize my learning and experience to do wonders for an organization. I love connecting with new people, you can reach me at kamran.abbasi2014233gmail.com

项目

Water Supply from Neka Water Channel to FCCL Plant's Reservoir - 9.6km
CFD Analysis of a Centrifugal pump
Thermoelectric cooler powered by Bicycle's Dynamo
Research study on 'The Prevention and Control of HIV/AIDS in Pakistan, a ch
Design and Manufacture of Pin on Disc Tribometer (FYP)

工作经历

公司标识
AM - Material Planning
Fauji Cement Company Limited
Jul 2019 - 代表 | Fateh Jang, Pakistan

Routine Jobs:
• Preparing CAPEX and OPEX budgets conforming to organizational strategic and operational goals
• Managing spare parts for Haver & Boecker Packing Lines, Flsmidth Ventomatic Packing Lines, Atlas Copco & CompAir Compressors, KSB Pumps, etc
• Visiting manufacturing facilities to find reliable market vendors – supplier sourcing (15 new potential suppliers added)
• Reducing import of OEM spare parts while increasing local procurement through research and development (R&D), engineering drawings development, and parts indigenization (optimized cost, saved 22 million PKR)
• Maintaining materials/spares to optimum min/max SKU levels through materials planning and inventory management on SAP MM Module (10% reduction in machine unplanned stoppages)
• Decoding preventive maintenance and condition monitoring charts on SAP PM Module to forecast upcoming maintenance jobs and do plant shutdown planning through CPM scheduling
• Meeting plant KPIs, developing SOPs, and optimizing plant downtime
• Developing BOMs for all new machines added to the plant
• Visible Felt Leader – conducting safety training and coaching workers on HSE protocols
Leading Roles:
Led the 04 people planning team in achieving the following inventory optimization targets:
• 20,634 inventory items classified as active, consumables, critical, and order on request
• Categorized raw materials and common spares into bearings & housings, seals, filter bags, fabrics, conveyor belts, v-belts, plates, air/oil filters, couplings & flexibles, lubricants, idlers, hardware items, and tools as per standard data masking.
• Updated descriptions for 20,634 items as per SAP standards.
• Removed 7,829 duplicate, obsolete, and slow-moving items.
• Identified common machines and spares at 03 plants, and rationalized inventory.
• Min/max inventory levels updated for 14,190 items and revised for 6,444 items.
(Key Achievement: Inventory value reduced by 20.7%)

公司标识
Trainee - Maintenance & Project Engineer
Fauji Cement Company Limited
Jul 2018 - Jun 2019 | Fateh Jang, Pakistan

Maintenance:
• Assisted in overhauling of the main gearbox (Make: Flender P2DA) of rotary kiln, for ThyssenKrupp GmbH 7600 tons/day capacity plant, in teamwork with German Engineer.
(Achievement: Kiln lighted up before the deadline, reduced plant downtime)
• Performed air audit of plant, in collaboration with Atlas Copco, to find potential air leakages in the couplings, hoses, tubes, fittings, and pressure regulators.
(Achievement: Fixed air leakages, 8 million/year cost savings)
Projects:
• Assisted in installation and commissioning of belt bucket elevator (Make: Aumund, 69.2 meters) at CF Silo-I, for 3700 tons/day FLSmidth plant, to replace the existing obsolete airlift material transport system.
(Role: Project Engineer | Achievement: Power consumption reduced by 73% from 240kw to 65kw)
• Assisted in installation and commissioning of a new cement packing line including major equipment of belt bucket elevator, vibrating screen, and rotary packer (Make: Haver and Boecker).
(Role: Project Engineer | Achievement: Cement dispatch capacity increased by 20%)

公司标识
Intern
Ibrahim Fibres Limited
Jun 2017 - Aug 2017 | Faisalabad, Pakistan

Project:
Improved efficiency of the induced draft cooling towers through design modifications:
• Performed thermodynamic calculations to find outlet conditions of the water from known inlet air conditions. By applying heat and mass balance on liquid and air, the makeup water was calculated by determining losses due to evaporation, blowdown, and drift.
• To increase the contact time between air and water for better heat transfer, the speed of spraying water was reduced by increasing the number of holes/nozzles in the water distribution system.
• Fill material found to have an impact on heat transfer. Cellulose film fill was chosen for the cooling tower to provide a target temperature drop of 15°C in cooling water.

公司标识
Intern
Fauji Cement Company Limited
Jun 2016 - Aug 2016 | Sadiqabad, Pakistan

Improved efficiency of the installed shell and tube heat exchangers verified by ANSYS Fluent simulation and analysis

学历

National University of Science and Technology
硕士, , Executive Master of Business Administration (EMBA)‎
Operations, Supply Chain and Logistics Management
CGPA 3.3/4
2022
Ghulam Ishaq Khan Institute of Engineering Sciences & Technology
学士, , Mechanical Engineering‎
Mechanical Engineering
CGPA 3.5/4
2018
Pakistan Atomic Energy Commission (PAEC) Model College
中级/A级, 理学院(工程预科), Fsc‎
Chemistry, Mathematics, Physics
所占比重 87%
2014

技能

熟练 Accounts Administration
中级 Cooordination Skills
熟练 Demand Forecasting
中级 Distribution Logistics
初学者 Financial Acumen
熟练 Innovation
中级 Interpersonal Leadership
熟练 Inventory Management
熟练 Mechanical Skills
中级 MS Excel Dashboards
熟练 Oral Communication Skills
熟练 Paper Manufacturing Process
熟练 Record Keeping
熟练 Revenue Analysis
熟练 Soft Skills
熟练 Strong Organizing Planning Skills
熟练 Techincal Knowledge
熟练 Technical Knowledge
中级 Warehouse Management

语言

熟练 乌尔都语
中级 英语