To contribute to the growth of a progressive organization by utilizing the knowledge and skill set that I have attained during the academic program and professional training. Looking to provide an opportunity that will complement the passion and enthusiasm I have for skill development for mutual benefits.
planing safe working practices and making necessary changes.
Keeping up to date and ensuring compliance with current health and safety legislation.
Ensuring that equipment is installed correctly/safely.
Working as an Electrical Engineer and I am responsible for the activities as follows• Manage the Electrical operation of an 8MW Coal fired Power Plant.• Analyse equipment monitoring data and develop an appropriate action plan.• Maintain the safe operation of power flow between generating stations and feeders.• Manage the load sharing activity of power plant.• Record and compile operational, power plant maintenance, and fuel distribution reports.• Lead the electrical team during the erection of Coating Unit 2 Fazal Paper Mills.• Supervise the Electrical safety procedure for power plant operation.• Manage the Health and Safety activities at the Power Plant.• Conducts toolbox talks before work activities.• Conduct Electrical Safety Training for the workers.• Lead the operational and maintenance team for the execution of all corrective preventive and predictive maintenancejobs.
Worked as Interne Electrical Engineer and I was responsible for below mentioned activities as following
• Calculation of transformer losses.
• Perform routine testing of transformer oil temperature and pressure during the filling process.
• Inspection of raw material and design of transformer.
• Inspection of winding of different types (packet winding, Disc Winding, Layer Winding), analyze the copper loses
• Perform Routine testing and special testing of transformer.
• prepare report of whole internship activity to present higher management.
Worked as Assistant Plan Manager and I was responsible for below-mentioned activities as following
• 3x1.1 MW generators, routine inspection and analyze data of all generator on the SCADA system.
• Adjust the temperature of the generation room and routine inspection of the cooling tower.
• Analyze the performance of generators and prepare the general report.
• Power distribution routine inspection goes of circuit breakers and relays.