Results oriented Mechanical Engineer with hands on approach to tackling projects and accomplishing goals.
Design, Fabrication, Installation and Commissioning of Water Softening Plant. Also strategized to include the new system in the old running system at Shafi Texcel Ltd.
Design, Fabrication, Installation and Commissioning of Water Filtration System at Pakistan Aluminum And Beverage Cans Ltd. (PABCL)
Assisted the Design, Fabrication, Installation and Commissioning of Demin Water Plant for boiler feed water of 2 x 22MW Co Generation power plant. First ever implemented the EDI Technology to achieve the minimal TDS at Chanar Energy Limited (CEL)
Design, Fabrication and Installation of dosing systems for Cooling tower feed water at Chanar Energy Limited (CEL)
Assisted the Supply of Design and Modification of existing running plant for optimized performance at US Apparel Pvt. Ltd.
Design, Fabrication and Supply of skid mounted High Pressure dosing system for boiler product water at Almoiz Industries Ltd.
Modification and Up gradation of existing Waste Water Treatment plant for increased influent load at Klash Dye House.
Up gradation and automation of existing Water Treatment Plant – RO Based. While keeping the system in operation and with minimal shutdown at Shamim And Co. (Pepsi Multan)
Design, Fabrication, Installation and Commissioning of skid mounted automated Water Softener Plant at Shamim And Co. (Pepsi Multan)
Design, Fabrication, Installation and Commissioning of 200 m3/hr Waste Water Treatment Plant at Diamond Fabrics Limited.
Design, Fabrication and installation of containerized RO plant for drinking water purpose holding capacity of 4LPM at JDW Channi Goth Farms
Design, Fabrication, installation and commissioning of process water WTP at Poplon Pakistan.
Designated to improve production process along with reduction of bottle necks in the production process to ensure conformance.
Performed on-floor surveys and wrote technical narratives in an efficient and timely manner.
Developed SOP for standardized procedures, and conduct training to validate results.
Completed project while providing technical solutions feedback.
Observed the processes of refrigeration and air conditioning, also observed the working of chillers (LiBr-H2O) and air handling units (Cooling Towers).
Production of electricity and Power distribution (5MW Gensets) system was also perceived.
Observed the process of maintenance and repair of locomotive engines
along with their complete disassembly and assembly.
Also observed the process of manufacturing of tools and equipment required for repair and
maintenance.
Observed the process of manufacturing various parts of cycle and motorcycle along with their assembling on production line and also offered different suggestions and proposals to improve the production of cycle and motorcycle.