خلاصہ

Seeking a challenging position in a Dynamic and rapidly growing organization. Competent and Authorized Person of Medical Gas. JCIA inspection experienced.Responsible for safe & efficient operational and preventative maintenance of MGPS and general facility maintenance activities in accordance with the regulatory requirements and guidelines provided in HTM 02.01.


پراجیکٹس

Sidra Medicine

تجربہ

کمپنی کا لوگو
Assistant Manager Medical Gas
OCS Facility Management services
فروری ۲۰۱۹ - موجودہ | Dubai, United Arab Emirates



       Maintain records of calibration of test equipment. 
          JCIA Inspection representative from the health care.
•        Quarterly testing of the medical air system. 
•        Respond and support in a timely manner, plan and/or emergency work.
•        Ensuring that the MGPS is operated safely and efficiently in accordance with the statutory requirements and guidelines.  
•        Responsible for the Permit to Work System, including the issue of Permits-toWork to Competent Persons (MGPS) for all servicing, repair, alteration and extension work carried out on the existing MGPS.  and supervise the daily activities of the MGPS technical team.
Oversees and carries out maintenance and repair of MGPS equipment.
Ensures that Planned Preventative Maintenance tasks are carried out in accordance with the schedule, frequency and task lists and provides reports on any works required thereafter.
Responsible for inspections and tests of medical gas outlets/inlets, zone valves, alarms and sources in the hospital.
Ensure that the MGPS maintenance specification and schedule of equipment (including all plant, manifolds, pipe work, valves, terminal units and alarm systems) are kept up to date.
Ensures that both the quality & quantity of the jobs are in line with KPIs. 

کمپنی کا لوگو
Medical Gas Team Supervisor
NMC Royal Hospital Abu Dhabi
مارچ ۲۰۱٦ - جنوری ۲۰۱۹ | Abu Dhabi, United Arab Emirates

JCIA Inspection representative from the health care.
AGS System Follow-up PPM and corrective maintenance.
Bed head out lets System Follow-up PPM and corrective maintenance.
Pendent System maintenance and Follow-up PPM.
Changing automatic manifolds cylinders and Follow-up the all cylinders in the hospital.
Daily Base Operation and Maintenance of Medical gas system.
Daily checking automatic gases manifolds.
Daily checking Medical & Surgical Air Compressors.
Daily checking Anesthetic Gas Scavenging System (AGSS pumps).
Daily checking Vacuum pumps.
Daily checking and recorded inspection the Emergency, O.T, ICU, Ambulance and Wards.
Follow-up the MGPS Empty and full Cylinders with refilling company.
Monthly and weekly meeting attending with our engineers. 
All Area Alarm Penal checking, Inspection and PPM.
Follow-up installation and PPM of the MGPS and Medical Furniture works.
Routine inspection and PPM of the Wheelchair.
Routine inspection and PPM of the Crash Cart.
Routine inspection and PPM of the Examination Couch Table.
Routine inspection and PPM of the Cardiac table.
Routine inspection and PPM of the Patient Stretcher.
Routine inspection and PPM of the Instrument Trolley.
Following all corrective maintenance work of the MGPS and all Medical Furniture.
Follow-up the Nurse Call System and corrective maintenance work.
Updated and completed all Documentation of the MGPS and Medical Furniture.
AVSU, s valves System Maintenance, testing, operations and 
Follow-up PPM and corrective maintenance.

کمپنی کا لوگو
Medical Gas Team Supervisor
ARAS Medical Equipment & Devices
فروری ۲۰۱۲ - فروری ۲۰۱٦ | Abu Dhabi, United Arab Emirates

All type of Compressors maintenance and PPM follow u
Follow-up PPM is going on Schedule for key Projects
JCIA Inspection representative from the health care.
Gases Manifolds System maintenance and PPM follow up
All type of Medical gas work follows up with Engineer
AVSU, s valves System Maintenance, testing, Commission, Operations and 
Follow-up PPM and corrective maintenance.
AGS System Follow-up PPM and corrective maintenance
Bed head out lets System Follow-up PPM and corrective maintenance
Pendent System maintenance and Follow-up PPM
Attending PPM with our Engineer.
Medical gas cylinders change in all departments of the hospital
Following automatic manifolds bank cylinders.
Daily Base Operation and Maintenance of Medical gas system
Following corrective maintenance work.
Daily checked automatic gases manifolds.
Daily checked Medical Air Compressors.
Daily checked Surgical Air Compressors.
Daily checked Anesthetic Gas Scavenging System (AGSS).
Daily checked Vacuum pumps
Daily recorded daily reading and inspection.
Daily checked and recorded inspection the Emergency, O.T, ICU, Ambulance and Wards.
Daily update and recorded daily logbook.
Monthly and weekly meeting attending in our and SEHA engineers. 
Oxygen liquid tank daily checked and Inspection.
All Area Alarm Penal checked, Inspection and PPM.
Anesthetic Gas Scavenging System Inspection and PPM.
COMPRESSERS maintenance and follow-up PPM as per approve schedule

کمپنی کا لوگو
Medical Gas Team leader
Sidra Medical and Research centre
مارچ ۲۰۱۱ - جنوری ۲۰۱۲ | Doha, Qatar

Update all in progress projects documentation which provide to higher management of company 
Attend meeting with our engineers
Prepare monthly report for work progress and submit to engineers
Follow-up work order receiving for installations works.
Workshop drawing for installation work submitting for approval and follow-up
Follow-up maintenance & installation of company key projects
Purchase of all spare parts for ongoing projects 
All type of Medical Gases work follows up 
Compressors System Maintenance, testing, commission, operations and Follow-up 

کمپنی کا لوگو
Medical Gas
Faber LLC.
مئی ۲۰۰۸ - فروری ۲۰۱۱ | Abu Dhabi, United Arab Emirates

Attending PPM with our Engineer
Medical gas cylinders change in all departments of the hospital
Following automatic manifolds bank cylinders
Daily Base Operation and Maintenance of Medical gas system
Following corrective maintenance work
Follow-up Medical gas maintenance & installation of company key projects
All type of Compressors maintenance and PPM follow up
Follow-up PPM is going on Schedule for key projects 
Gases Manifolds System maintenance and PPM follow up
All type of Medical gas work follows up with engineer
AVSU, s valves System Maintenance, testing, commission, operations and Follow-up PPM and corrective maintenance
Anesthetic gas scavenging system (AGSS) Follow-up PPM and corrective maintenance
Bed head out lets System Follow-up PPM and corrective maintenance
pendent System maintenance and Follow-up PPM
Prepare monthly report for work progress and submit to engineers
COMPRESSERS maintenance and follow-up PPM as per approve schedule 
AVSU, s Valves System maintenance and follow-up PPM as per approve schedule
Bed head out lets System maintenance and follow PPM as per approve schedule
Gas Manifolds system maintenance and follow-up PPM as per approve schedule

تعلیم

Engage in learning
سرٹیفیکیشن, ‎
Infection Control
مکمل
2019
OCS Group UK
سرٹیفیکیشن, ‎
مکمل
2019
Engage in learning
سرٹیفیکیشن, ‎
Health & Safety In The Office
نامکمل
2019
Engage in learning
سرٹیفیکیشن, ‎
First AId
نامکمل
2019
Engage in learning
سرٹیفیکیشن, ‎
Electrical Safety
مکمل
2019
Engage in learning
سرٹیفیکیشن, ‎
مکمل
2019
Engage in learning
سرٹیفیکیشن, ‎
مکمل
2019
OCS Group UK
سرٹیفیکیشن, ‎
Fire Safety
مکمل
2019
OCS Group UK
سرٹیفیکیشن, ‎
مکمل
2019
OCS Academy UK
سرٹیفیکیشن, ‎
مکمل
2019
OCS Group UK
سرٹیفیکیشن, ‎
Time Management
مکمل
2019
Govt. Polytechnic institute, Bannu
ڈپلوما, ‎
Mechanical Engineering
مکمل
2006
Government high school No 2 Bannu
میٹرک / او لیول, , ‎
Computer Science
2003

پیشہ ورانہ مہارتیں

متوسط CAFM
متوسط FSI
ماہر Lab Knowldge
ماہر Medical Entry
متوسط Microsoft Applications Experience
ماہر Presentable Skills
متوسط Social Studies Subject Command

زبانیں

ماہر اردو
ماہر پشتو
ماہر انگریزی

آپ کن کمپنیز کی پیروی کر رہے ہیں