Summary

I have extensive practical knowledge and understanding of electrical systems and components, including power distribution, transformers, switchgear, motors, and generators with effective communication skills. I have successfully managed wind power projects with a combined capacity of 600 MW. My primary area of specialization lies in EPCC Projects, Power Plants, and other Energy-related roles. I am confident that I can make valuable contributions to your esteemed organization's objectives and targets. Throughout my career, I have consistently demonstrated my ability to accomplish complex and goal-oriented assignments, such as creating project execution plans, overseeing project implementation, preparing BOQ, procurement specifications for materials and equipment, and ensuring the completion of quality documents within the stipulated timeline. I possess expertise in project planning, quality control, scheduling, resource management, testing, construction, operation, and maintenance of electrical.

Projects

50 MW Gul Ahmed Wind farm Project
50MW Metro Wind Farm Project
100 MW FWEL Wind Farm Project 1 & 2
132KV Substation for Zorlu Enerji Wind Farm Project
132KV Substation for FFCEL Wind Farm Project

Experience

Company Logo
Lead Engineer Electrical
Hydrochina International Engineering and Construction Company
May 2020 - Present | Karachi, Pakistan

Working as a team lead for the electrical department. With the following major responsibilities, 1. Review electrical engineering drawings and highlight required changes to Engineering Department.2. Preparation of project execution plan and monitoring for proper implementation.3. Following up with sub-contractor for timely completion of project tasks.4. Testing and Commissioning of Power System Protection Scheme and also verification.5. Monitor subcontractor’s team during the execution of all electrical work.6. Review IFC drawings and related documents prior to the start of work.7. Manage and lead Electrical subcontractors' site staff throughout the duration of the project from start through T&C (Testing and Commissioning) and final handover to the client.8. Provides updates on progress or significant project issues to the Project Manager or Site Manager.9. Controls and supervises progress and quality of installation works as per approved documents.

Company Logo
Electrical Engineer
Descon Engineering Limited
Jan 2014 - Mar 2020 | Karachi, Pakistan

Working in Project Management Department, Key Resposibilties include,
Engineering and Design reveiw:
 EBOP equipment and Design reveiw.  Review of grid interconection scheme.  Reveiw of substation and telecommunication detail design.  22KV Collection System interconnected scheme  Cable trays, HVAC, Lighting and small power drawings  VSAT, PABX and Fire alarm system  CCTV and Radio communication drawings  EPA compliance and EPC compliance  QA/QC Documents Construction/Erection/Installation:
22KV Collection System:
 Installation of wind turbines with converter and other electric accessories  Installation of GSU and RMU  WTG Rotor and stator Power cables jointing and termination  Earthing system, cable trays, electrification, Fire alarm system and CCTV System  LV, MV, FO & Cu Conductor Cable Laying & termination, FO Cable Splicing. Control/Substation Building:  Installation of Relay and Control Panels, MV Panels, AC/DC Panels, Capacitor Panels, Telecommunication Panels, SCADA Panels, DC Battery banks system, Shunt compensation system, Auxiliary transformer and EDG  HVAC, Lighting and small power, Plumbing and motor pumps  Fire alarm system, PABX, CCTV System and Radio communication system 132KV Grid station:  Installation of earthing grid mesh and Lightning protection system  Installation of Power Transformers, Grounding transformers, Surge arrestors, Instrument Transformers, 132KV HV Switchgear, CCTV with Line Traps  Installation of steel structure for Electrical HV Equipment’s and Cable trays.

Company Logo
Assistant Engineer (Electrical)
Pak Construction Company
Apr 2013 - Nov 2013 | Hyderabad, Pakistan

Working on electrification of residential complexes. Handling the duties of Electrical Engineer and complete documentation.

Company Logo
Electrical Engineer
Alstom Grid Pakistan (Pvt) Ltd.
Apr 2012 - Mar 2013 | Karachi, Pakistan

Working on,
1) 49.5MW FFC WIND POWER PLANT Working on a turnkey project of 49.5MW Wind Power Plant Jhimpir. Handling the duties of Testing Engineer. Project includes the procurement, Installation, testing and commissioning of 132/22KV Hybrid substation. Project also includes installation of SCADA system.
2) 56.4MW ZORLU WIND PLANT Working on a turnkey project of 56.4MW Zorlu Power Plant Jhimpir. Handling the duties of Testing Engineer. Project includes the procurement, civil work, installation, testing and commissioning of 132/20KV Air Insulated Substation. Project also includes the installation of SCADA System.

Education

Mehran University of Engineering & Technology
Bachelors, , Bachelors of Engineering‎
Electrical
CGPA 3.2/4
2011
Preston University
Intermediate/A-Level, , FA (Higher Secondary Certificate)‎
Pre-Engineering
Percentage 74%
2007

Skills

Expert Construction Management
Intermediate Diagnosing Skills
Expert Electric Power Management
Intermediate Electrical Cantrols
Expert Electrical Code
Intermediate Electronics Repair
Intermediate Fireproofing Works
Intermediate Flexography Knowledge
Intermediate LTN
Expert Malfunctions Identification
Intermediate Metal Decking
Intermediate Operation & Maintenance
Beginner Power Electronic Designing
Expert Proficient in Mandarin
Intermediate Steel Installation
Expert Sterilization Procedure
Intermediate Technical Project Leadership
Intermediate Troubleshooting
Expert إدارة فريق المشروع
Expert التخطيطات الكهربائية

Languages

Expert Urdu
Expert English