I have extensive practical knowledge and understanding of electrical systems and components, including power distribution, transformers, switchgear, motors, and generators with effective communication skills. I have successfully managed wind power projects with a combined capacity of 600 MW. My primary area of specialization lies in EPCC Projects, Power Plants, and other Energy-related roles. I am confident that I can make valuable contributions to your esteemed organization's objectives and targets. Throughout my career, I have consistently demonstrated my ability to accomplish complex and goal-oriented assignments, such as creating project execution plans, overseeing project implementation, preparing BOQ, procurement specifications for materials and equipment, and ensuring the completion of quality documents within the stipulated timeline. I possess expertise in project planning, quality control, scheduling, resource management, testing, construction, operation, and maintenance of electrical.
Working as a team lead for the electrical department. With the following major responsibilities, 1. Review electrical engineering drawings and highlight required changes to Engineering Department.2. Preparation of project execution plan and monitoring for proper implementation.3. Following up with sub-contractor for timely completion of project tasks.4. Testing and Commissioning of Power System Protection Scheme and also verification.5. Monitor subcontractor’s team during the execution of all electrical work.6. Review IFC drawings and related documents prior to the start of work.7. Manage and lead Electrical subcontractors' site staff throughout the duration of the project from start through T&C (Testing and Commissioning) and final handover to the client.8. Provides updates on progress or significant project issues to the Project Manager or Site Manager.9. Controls and supervises progress and quality of installation works as per approved documents.
Working in Project Management Department, Key Resposibilties include,
Engineering and Design reveiw:
EBOP equipment and Design reveiw. Review of grid interconection scheme. Reveiw of substation and telecommunication detail design. 22KV Collection System interconnected scheme Cable trays, HVAC, Lighting and small power drawings VSAT, PABX and Fire alarm system CCTV and Radio communication drawings EPA compliance and EPC compliance QA/QC Documents Construction/Erection/Installation:
22KV Collection System:
Installation of wind turbines with converter and other electric accessories Installation of GSU and RMU WTG Rotor and stator Power cables jointing and termination Earthing system, cable trays, electrification, Fire alarm system and CCTV System LV, MV, FO & Cu Conductor Cable Laying & termination, FO Cable Splicing. Control/Substation Building: Installation of Relay and Control Panels, MV Panels, AC/DC Panels, Capacitor Panels, Telecommunication Panels, SCADA Panels, DC Battery banks system, Shunt compensation system, Auxiliary transformer and EDG HVAC, Lighting and small power, Plumbing and motor pumps Fire alarm system, PABX, CCTV System and Radio communication system 132KV Grid station: Installation of earthing grid mesh and Lightning protection system Installation of Power Transformers, Grounding transformers, Surge arrestors, Instrument Transformers, 132KV HV Switchgear, CCTV with Line Traps Installation of steel structure for Electrical HV Equipment’s and Cable trays.
Working on electrification of residential complexes. Handling the duties of Electrical Engineer and complete documentation.
Working on,
1) 49.5MW FFC WIND POWER PLANT Working on a turnkey project of 49.5MW Wind Power Plant Jhimpir. Handling the duties of Testing Engineer. Project includes the procurement, Installation, testing and commissioning of 132/22KV Hybrid substation. Project also includes installation of SCADA system.
2) 56.4MW ZORLU WIND PLANT Working on a turnkey project of 56.4MW Zorlu Power Plant Jhimpir. Handling the duties of Testing Engineer. Project includes the procurement, civil work, installation, testing and commissioning of 132/20KV Air Insulated Substation. Project also includes the installation of SCADA System.