Highly energetic and enthusiastic engineer bringing productive engergy and accuracy to both
individual and group projects. Aiming to reduce power shortfall through sustainable energy
production and consumption and making the power system more efficient and reliable for lesser
chance of instability in Power System.
Head of Solar Park at Kohinoor Maple Leaf Group of all the 3 Divisons: Rawalpindi, Gujar Khan and Raiwand
EPC projects Contract, Erection, Execution, Commissiong and Operation & Maintenance supervision.
Power Plant Documentation and Management
Designing / Erection, Execution and Commissioning along with Quality and Quantity Assurance
Weekly meetings with owner of the Group and Higher Management to brief about projects progress.
Cost control documents and quality control activities, Track project status regularly and ensure to execute projects within allotted budget and timelines along with S – curve details and weekly agendas / minutes of meetings.
Reviews design documents and give input for construction, procurement, engineering planning. EPC and Turnkey.
Liaison with subcontractors in EPC projects, for timely completion of project with required specifications
Actively communicates with all stakeholders - team project teams and responsible for project related issues.
Ensures compliance with Quality and EHS standards for all projects. FAT & SAT
Supports the higher management in identifying, evaluating, assessing and escalating risk and opportunities & strategy.
Practical hands of work on Solar Software, Sketchup, PVSyst, Helioscope – Logiciel Photovoltaïque, LCS (Local
Commissioning and Service Tool), Sensors including Environment Monitoring Sensor/Weather Stations – ABB,
SMA 60 and 75kW Inverters, Huawei 100KTL and 200KTL Commissioning and maintenance.
Parallel Operations of Gen Sets and Solar Plant
The Process of EPC Projects and Testing at each phase meeting quality standards involves:
Contract Documents Compilation Letter of Intent Compilation (LOI) Memorandum of Understanding Compilation (MoU)
Design Documents Verifications and Acceptance Charter of Project
Quality and Quantity Punch Lists Bill of Quantity and Bill of Materials (BOQ & BOM)
Hooking up Solar with WAPDA the legal documentation and approval for NEPRA and DISCO’s. In addition to this compilation of documents for the signatory of Electrical Inspector.
which is completed successfully. Upon increase of load the Electric Supply Sub Station is in progress. The involvement in thesetask and going through all the Standard Operating Procedures is included.
Managing a total of 20 workers for Solar Plant, Overtimes, Log Sheets, Material Demands, Work Orders, Planned Shut downs, temporary worker’s
recruitment, staff management during overhauling of engines, monitoring of solar park on online portal and scheduling
Solar Designs Evaluation, Operation and Maintenance and Team Management.
Solar Projects Quality and Quality. Audits the progress of the projects and enhance the designs for towards reliability and flexibilty
Installation, Operation and Configuration along with team management